18
(ex. Galvanize plant, Chemical Plant, Dye-work, etc. )
(d) Damage caused by operating on the wrong electric voltage.
(e) Damage caused by user amend the product.
(f) Damage caused by natural disaster.
3. Warranty Scope shall be permitted by Cheng Day Machinery and Within One Year of
damaged Mechanical Spare Parts Repair and Replacement.
(circumstance stated in detail No. 2 are not included.)
6.3 Overload
clutch adjustment instructions
Description
Picture
Mechanical Brake and Overload Protection
Setting is 125% rated load
1.Use rolling bearing nut fixture to tighten the clutch nut
fixture.
2.It can be able to lift in 100% rated load.
3.Adjust the load to 125% rated load
4.Clutch is slipping, cannot lift, setting complete.
5.Setting the
clutch does not slip when lifting a load
6.Loosen the adjusting nut, and set the clutch slip, be
unable to lift the load.
7.Adjust load to 100% rated load, clutch does not slip and
can be able to lift the load.
8.Adjust the load to 125% rated load, clutch slip the
loading material. Setting complete.
9.Setting of overload is 100% rated load can be able to lift
and 125% rated load have to slip.
After setting complete, level
rolling bearing nut washer at
nut groove, tap washer to secure it, to prevent loosening.
Adjust load to 100% rated load
,
It is able to lift in 100%
rated load
,
Setting complete.
Содержание U-MEGA Series
Страница 20: ...19 7 TROUBLESHOOTING 7 1 Wiring Diagrams ...
Страница 25: ...24 ...
Страница 29: ...28 41 408335 Hex Recess Bolt M6 1 0 40 8 408660 Hex Recess Bolt M6 1 0 35 6 ...
Страница 42: ...41 ...
Страница 49: ...48 ...
Страница 50: ...49 12 11 ELECTRIC ASSEMBLY 6 10 1 2 3 4 5 8 9 7 13 14 15 16 17 18 ...
Страница 52: ...51 ...