MAINTENANCE
SCE-20 C 9.808-371.0
4-3
Only qualified maintenance personnel are to perform the following repairs.
Seul le personnel d'entretien qualifié peut effectuer des réparations.
SOLUTION PUMP REPLACEMENT
1. Turn off all switches and unplug the machine.
2. Remove recovery tank.
3. Remove the (2) screws that fasten the solution tank to the frame, and tilt tank back to expose the inside of the frame.
4. Remove solution hoses from fittings in pump.
5. Remove the (2) screws that fasten the pump to the frame.
6.
Reverse process to install pump.
PUMP REPLACEMENT KITS SHURFLO 100 PSI
Bypass Valve Asm
Diaphragm
Pump Head Replacement
Switch Asm
Содержание SCE-20
Страница 26: ...NOTES SCE 20 C 9 808 371 0 4 7...
Страница 27: ...FRAME ASSEMBLY SCE 20 C 9 808 371 0 5 1...
Страница 29: ...BRUSH ASSEMBLY SCE 20 C 9 808 371 0 5 3...
Страница 31: ...PUMP ASSEMBLY SCE 20 C 9 808 371 0 5 5...
Страница 33: ...VACUUM SHOE ASSEMBLY SCE 20 C 9 808 371 0 5 7...
Страница 35: ...CONTROL PANEL ASSEMBLY SCE 20 C 9 808 371 0 5 9...
Страница 37: ...SOLUTION TANK ASSEMBLY SCE 20 C 9 808 371 0 5 11...
Страница 39: ...RECOVERY TANK ASSEMBLY SCE 20 C 9 808 371 0 5 13...
Страница 42: ...WIRING DIAGRAM SCE 20 C 9 808 371 0 5 16...