Installation Instructions
The optional blower kit (WODC.BLOW) is equipped with a three prong power cord and may be installed at any time.
Follow installation instructions supplied with the kit. Route power supply cord away from heater.
Electrical rating: 115 volts A.C., 60Hz, .5 amps.
Fan output rating: 125 CFM
Blower Operation
Proper blower speed matched with air control setting will ensure peak performance from your stove. Operate as follows:
• Air control set to "L" (low), operate blower speed control on "Low".
• Air control set between "L" and "H" (low and high), operate blower speed control at desired setting.
Automatic:
To operate the blower automatically, set the rocker switch on the side of the fan housing to "Auto" and set
the speed control to desired setting. This will allow the fan to turn on as the stove heats up to operating temperature. It
will also shut the blower off after the fire has gone out and the unit cooled to below a useful heat output range.
Manual:
To manually operate the blower, set the rocker switch to "Man" and set the speed control to desired setting.
This will bypass the sensing device and allow full control of the blower. Switching from "Auto" to "Man" or selecting
speed may be done anytime.
Optional Blower
19
290816-24_ NEO 1.2
5055.600-A