- - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - ▲
I
NSTRUCTION
M
ANUAL
MEGA-M250b
Abrasive Cutter
3601 E. 34th St. Tucson, AZ 85713 USA Tel. +1 520-882-6598 Fax +1 520-882-6599 email: [email protected] Web: http://www.metallographic.com
Please read this instruction manual carefully and follow all installation, operating and safety guidelines.
Recirculating tank connections
6
(Installation continued on next page)
Drain into
screen
Pump
Tank
drain
External coolant supply:
Attach 1/2-inch tube between pump and cutter.
Drain:
1.5-inch (38 mm) tube.
Electrical connections:
Connect six-foot electrical power cable to source.
Note: Inspect the operating voltage on the name plate.
Electrical connection for
external coolant supply:
Power for recirculation system comes from the
MEGA-M250
,
Recommended Coolant:
To minimize corrosion a coolant with a anti-corrosion additive or an oil
emulsion coolant is recommended. Note: It is recommended that the
coolant be changed every 50 cuts or every week, whichever occurs
first.