![Pace Technologies FEMTO-1100S Скачать руководство пользователя страница 10](http://html.mh-extra.com/html/pace-technologies/femto-1100s/femto-1100s_instruction-manual_745781010.webp)
FEMTO-1100S Polishing Head
I
NSTRUCTION
M
ANUAL
- - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - ▲
3601 E. 34th St. Tucson, AZ 85713 USA Tel. +1 520-882-6598 Fax +1 520-882-6599 email: [email protected] Web: https://www.metallographic.com
Please read this instruction manual carefully and follow all installation, operating and safety guidelines.
5
2.3 Installation
•
The NANO-FEMTO should be placed on a stable flat surface with access to
water, drain and electrical connections.
•
After water, drain and electrical connections are established the system is
ready for operation by activating the main power switch.
•
The FEMTO will come preinstalled on the NANO base unit if purchased
together. Plug in the power and communication cables to the backs of the
machines.
2.3.1 Installing on NANO-S Base Unit
•
If the FEMTO 1100S is purchased as an upgrade to for a NANO-S
polishing unit it must be installed. Follow the below steps:
1.
Move the NANO unit to a sturdy “work station” with the ability to
access the bottom of the unit
2. Remove rear cover of NANO-S unit
3. Unplug all connections for the Screen Post
4. Remove Screen Post and set aside
5. Align the FEMTO with the same hole the screen was removed
from and drop it into place. The head will seat inside a slotted
channel on the spacer of the NANO
6. Ensure the FEMTO post does not rotate (the post should be
stationary while the head itself is movable). If you are unable to
rotate the shaft with your hand it should be seated properly
7. From the bottom of the unit, use the supplied socket head bolt
to secure the post. Torque down on the bolt using the supplied
allen set
8. Return NANO-FEMTO to desire location
9. Plug in power and communication cables to the backs of the
units