![Pace Edwards UltraGroove Electric KE2003 Скачать руководство пользователя страница 4](http://html.mh-extra.com/html/pace-edwards/ultragroove-electric-ke2003/ultragroove-electric-ke2003_installation-instructions-manual_745762004.webp)
3
STEP 4: INSTALLING RAILS
Left Rail
Right Rail
Tailgate End
Cab End
Remove the protective paper from the foam on the underside of the Rail flanges. This is for
packaging purposes only.
Next identify the left and right side
rails (FIG 4A).
The rail flange and foam towards the outside of
the truck bed.
HARDWARE
USED
:
1/4-20 X 5/8” RAIL
SCREW x 2
1/4” FLAT
WASHER x 2
1/4” LOCK
WASHER x 2
First make sure that the Lead Rib Flange is in pulled toward the tailgate
enough to clear the Canister Flange and Canister Stop (FIG 4B).
Figure 4B shows that the
lead rib needs to be
pulled out toward the tail
gate. Now hook the rail
into the rail guide and roll
it down making sure to
not get the sweep seal
folded back into the rail
(FIG 4C &9A).
FIG. 4C
Hook Rail feature into
Rail Guide here
Sweep Seal
Lead Rib
Notch
FIG. 4B
Canister
Flange
Lead Rib
Flange
Canister
Stop
PULL OUT
FIG. 4A
FIG. 4B