![Paccar DAF POWERCHOICE 250A Скачать руководство пользователя страница 8](http://html1.mh-extra.com/html/paccar/daf-powerchoice-250a/daf-powerchoice-250a_installation-manual_3108977008.webp)
3. Civil work and mechanical
installation
The civil work and mechanical installation require hoisting or lifting tasks that may require multiple
people or machines for that purpose.
It is the sole responsibility of the installer, to make sure:
•
the mechanical installation work is executed in compliance with the, local and national Codes,
Directives, Standards, Rules and Regulations;
•
the hoisting and lifting work is executed by certified persons and with appropriate equipment.
Danger:
Failing to adhere to these points may result in a variety of consequences from
damaged equipment to personal harm or death.
Caution:
Be careful when you handle the coated and painted parts. Damaged coating can
cause corrosion. Corrosion can cause serious damage to the parts.
8
Prepare for installation
3.1
1. Put the pallet with the cabinet on a flat and stable surface with sufficient space to work.
2. Remove and discard the packaging material.
3. Dispose of the packaging material in accordance with the local regulations.
Preparation
3.1.1