Contents
1
Preface
1.1
1.1.1
1.2
About the document
Structure of this document
Target groups
4
4
4
4
4
2
Introduction
2.1
2.2
2.3
2.4
Site layout considerations
Distance from dc outlet column to base station
Floorplan
Install options
5
5
5
6
7
3
Civil work and mechanical installation
3.1
3.1.1
3.2
3.2.1
3.2.2
3.3
3.3.1
3.3.2
3.3.3
3.4
3.5
3.6
Prepare for installation
Preparation
Wall mount
Installation kit
Install the column against the wall
Install the base frame + foundation
Installation kit
Preparations
Install the base frame
Install base frame on the floor
Install base frame on the floor with chemical anchors
Install the column on the base frame
8
8
8
9
9
10
11
12
12
13
14
14
14
4
Electrical installation
4.1
4.1.1
4.2
4.2.1
4.2.2
4.2.3
4.3
Preparation
Switch off base product
Overview of connections to be made
Charge column ccs2
Connecting charge column
Multiple dc outlet columns
After installation test
15
15
15
16
16
17
18
19