14
2.3.3 Overview of the EVSE, inside
A EVSE
B AC input cable
C Power distribution board
Part
Function
EV
The EV of which the batteries need to be charged
EVSE
Refer to section 2.4.2.
Parking space
Location for the EV during the charge session
AC input cable
To supply the electrical energy to the EVSE
Power distribution board
To connect the EVSE to the AC grid input
EV charge cable
To conduct the charge from the EVSE to the EV
2.4 Authorization to charge
It is possible to use the EVSE with or without authorization.
An authorization can be based on RFID, a personal identifi cation number, or a mobile authentication
method. Authorization requires a subscription to a back offi ce.
Authorization can be a standard solution from the manufacturer, or from an external company that offers
authorization solutions via OCPP.
D Parking space
E EV
F EV charge cable