6
1. Remove both Snap Rings and push the Front and
Rear Pistons inside Body.
2. Remove the Screws from the Rear Guide Holder
T3-204. Pull out together with Speed Adjustment
Knob T3-401.
3. Remove the Front Guide Holder T3-203.
4. Remove both Guide Holders (L & R) T3-201 and the
twelve (12) Ball Bearings.
5. Back out the Locking Screw T3-406 and remove the
Speed Adjustment Valve T3-603.
6. With both T3-701 Tools provided in the kit, remove the
Valve Discs and the Rod.
7. Check all “O” Rings, Springs, Discs, and Seals for
damage and replace as needed.
Factory Repair & Rebuild Service
Return the Transporter by UPS
Prepaid
to our repair center.
After teardown and inspection, P/A Industries will notify you
of the recommended cost for spare parts and labor.
1. Install the Speed Adjustment Valve T3-603 and align
with the groove for the Locking Screw T3-406.
2. Insert the Front Piston T3-302 into the Body with the
Bumper Ring.
3. Mount the Bumper Ring and insert the Rear Piston
T3-303 into the Body.
4. Grease both Guide Holders T3-201 and put twelve (12)
Ball Bearings into both Bearing Plates T3-210. Hold
the Bearing Plates by hand while attaching Front and
Rear Holders.
The Guide Holder assembly must run
smoothly in both directions without side-to-side
play.
5. Pull both Pistons T3-302 and T3-303 back into position
and secure the Snap Rings.
7
5.5”
140mm
1/8” NPT
Feed Direction
7”
178mm
Use Six M6 Screws
8mm Deep Thread
for Tray Mounting
Use Four
M8 Bolts for
Mounting
3.3”
83mm
1.3”
34mm
4.7”
120mm
.75”
19mm
Speed Adjustment Knob
5.9”
150mm
5.1”
130mm
.4”
10mm
2”
51mm
MODEL TP-3 SERVICE
Disassembly
Reassembly
MODEL TP-3 DIMENSIONAL DRAWING