5
STEP 1:
PREPARE THE WINDOW
Lower sash must open sufficiently to allow a clear
vertical opening of 13 inches (330 mm). Side louvers
and the rear of the AC must have clear air space to
allow enough airflow through the condenser for heat
removal. The rear of the unit must be outdoors, not
inside a building or garage.
MOUNTING HARDWARE:
3/4" (or 1/2")
Screws (7 pcs)
Lock Frame
(2 pcs)
Sash Lock
(1 pc)
Window
Sash Seal
Foam (1 pc)
Weather Stripping
10"x
3
/
4
"x
1
/
12
"
(5 pcs)
STEP 2:
PREPARE AIR CONDITIONER
A.
Remove the air conditioner from the carton and
place on a flat surface.
B.
Remove top rail from the rear of the packaging
material as shown in Fig. A.
TOP RAIL HARDWARE:
3/8" Screws
(4 pcs)
Top Rail
(1 pc)
C.
Align the hole in the top rail with those in the top of
the unit as shown in Fig. B.
D.
Secure the top rail to the unit with the 3/8″ screws
as shown in Fig. C.
NOTE:
For safety reasons, all four (4) screws MUST be
securely fastened.
STEP 3:
INSTALLING THE WINDOW A/C
NOTE:
Top rail and sliding panels on each side are
offset to provide the proper pitch of 5/16″ to the
rear. This is necessary for proper condensed water
utilization and drainage. If you are not using the
side panels for any reason, this pitch to the rear must
be maintained.
A.
Place unit on floor, a bench or a table. There is one
left and one right side filler panel. Be sure to use
the proper panel for each side. When installed, the
flange for securing the panel to the window sill will
be facing into the room.
C
. Slide the free end “ ” section of the panel directly
into the cabinet as shown in Fig. 2. Slide the
panel down. Be sure to leave enough space to slip
the top and bottom of the frame into the rails on
the cabinet.
" "
FIG. A
Packaging
Top Rail
FIG. C
FIG. B
FIG. 1
FIG. 2
B
. Hold the accordion panel
in one hand and gently pull
back the center to fill the
open end. See Fig. 1.