7
MAINTENANCE
Maintenance schedule.
System/
Component
Procedure
Each use
Every
25
hours
Every
50
hours
Every
100
hours
Note
Eng
in
e
Fuel leaks and spillages
Wipe out
○
Fuel tank, air and fuel
filter
Inspect/clean
○
○
Replace as
required
Idle adjusting screw
See idle adjustment
○
Replace
carburetor
as required
Spark plug
Clean and adjust
○
Re-gap to
0.6 to 0.7
mm – or
replace
Cylinder fin intake air
cooling vent
Clean
○
Exhaust, spark arrester
and cylinder exhaust
port
Clean
○
Shaft
Throttle trigger STOP
switch
Check operation
○
Cutting parts
Replace as required
○
Transmission
Grease
○
Screws/nut/bolts
Tighten and /or replace
○
○
Not
adjusting
screws
Cutting attachment
guard
Make sure it is attached
○
Cuttin
g
u
ni
t
Oiling port
Clean
○
Guide bar
Clean
○
Sprocket
Inspect and replace as
required
○
Saw chain
Inspect and sharpen.
○
Make sure that the engine has been stopped and allowed to cool down
before carrying out any maintenance.
Contact with hot and/or moving parts may cause personal injury.
All maintenance operations - except those listed in the
operating instructions, must be performed by qualified service personnel
23
Содержание P5200MT
Страница 30: ...30...
Страница 31: ...31...
Страница 32: ...P1PE Position One Power Equipment Isaac Way Pembroke Dock Pembrokeshire SA72 4RW www p1pe co uk...