9
MAN 9059510 EN V2
P. Lindberg A/S
Sdr. Ringvej 1
www.p-lindberg.dk
Tel.: +45 70212626
DK-6600 Vejen, Denmark
E-mail: [email protected]
Position both carriages at
the same height in both
sides. Allow them to rest
on the safety locks.
Fit the cables in the rollers
and tighten them using
the nuts in the end of the
cables.
Ensure that the cables are
adjusted with equal
tension to ensure that the
carriages raise uniformly
in both sides when the
automotive lift is
assembled.
Fit the hydraulic station to
the column.
Fit the oil hoses and
tighten the fittings so that
the hydraulic system is
sealed.
Fill the container with
hydraulic oil.
(Type HVI 32 or HVI 46,
10
litres)
•
Fit the electrical cabinet to the column.
•
Fit the four magnetic valves in the columns.
•
Run cables from the magnetic valves to the electrical cabinet.
•
Fit the guard plate between the two towers.
•
Connect power to the electrical cabinet and the motor.
•
Fit the lifting arms.
•
Lubricate the carriages’ contact surface on the columns.
•
Bleed the hydraulic system by repeatedly raising and lowering the carriages.
Cable
Nut M16
Carriage
Column
Cylinder
Cylinder
Angle
Angle
Oil hose
Long fitting
Oil hose
Short
fitting
Hydraulic
station