4
MAN 9050619 EN V1
P. Lindberg A/S
Sdr. Ringvej 1
www.p-lindberg.dk
Tlf: 70212626
DK-6600 Vejen
e-mail: [email protected]
Now tighten the whole
thing together. First,
tighten the four bolts
between the drawbars
and the collector.
Next, tighten the two
bolts that hold the
drawbars together.
Lastly, tighten the
clevis coupling
together.
Put the draw pin in the
clevis coupling
together with the two
spacers and the lynch
pin.
Fit the handle for the
height adjustment on
the transverse tube.
Use two M8 x 40 bolts
and M8 locking nuts.
Do not tighten yet.
Содержание 9050619
Страница 2: ......