………………………………………………                                                        USER AND MAINTENANCE HANDBOOK L150A 

 

P.Energy                                                                                                            

P.Energy                                                                                                            

P.Energy                                                                                                            

P.Energy                                                                                                            

11

 - 

30

 

 

 

3.

 

INSTALLATION 

 

 

3.1.

 

INTRODUCTION 

The laminator is delivered to the customer as agreed upon contract.

 

Before proceeding to the positioning of the machine, check the general status and the correspondence as described on the transport 

document 

 

IMPORTANT: FOR EVERY PROBLEM RISCONTRATO CONTACT IMMEDIATELY THE MANUFACTURER 

 

3.2.

 

FOUNDATIONS 

The laminator must stand an a solid, well leveled floor. 

The client must check load bearing capacity (especially if on raised floors), and that the fixing used for the foundation fixing bolts of good 

quality. 

 

3.3.

 

EQUIPMENT FOR LIFTING AND TRASPORTING 

It is the responsibility of the client to obtain all the equipment necessary for lifting and moving the laminator. 

We recommend that the movement are make by a lift trucks, following this instructions. 

a)

 

Use a right lift truck has a load capacity suitable for the weight of the machine to be moved 

b)

 

The forks lift truck ‘s  extensioned clamp must have the same length of the machine 

c)

 

Place the forklift truck ‘s  extensioned clamp between the base and the 

Adjustable feet

 

d)

 

Move the machine to the place of installation, taking care to fix the 

Mobile arm of operator panel

 

e)

 

If the machine must work in line with other production plant, it is important to make sure it is positioned correctly in line with the 

line 

f)

 

Check the level of the machine on the various sides 

NOTE: The operations of lifting and moving the laminator must be carried only by allocated personnel who have been suitably trained in the 

operations of lifting and moving the machine.

 

 

Содержание L150A

Страница 1: ...USER AND MAINTENANCE HANDBOOK L150A P Energy P Energy P Energy P Energy 1 30 USER AND MAINTENANCE HANDBOOK LAMINATOR L150A SERIAL NUMBER...

Страница 2: ...IPMENT FOR LIFTING TRANSPORTING 3 4 ELECTRICAL CONNECTION 3 5 PNEUMATIC CONNECTION 3 6 HYDRAULIC CONNECTION 3 7 DESCRIPTION OF WORKING CYCLE AND ALLARMS MACHINE 3 7 1 DESCRIPTION OF PUSHBUTTONS OPERAT...

Страница 3: ...190 Fax 39 0 49 79 68 776 Web Site www penergy it e mail info penergy it THIS MANUAL IS PART OF THIS MACHINE AND CONTAIN ALL NECESSARY INFORMATION CONCERNING USE AND MAINTENANCE IF YOU DON T PAY ATTE...

Страница 4: ...L150A P Energy P Energy P Energy P Energy 4 30 1 2 SERIAL NUMBER In order to identify the laminator it s necessary to recognize the following specification data plate fixed on side machine Data on CE...

Страница 5: ...y sheet guard included the vacuum pump and hydraulic circuit On the back side there are the electrical pneumatic hydraulic feeding The area inside the cover is protected by two light barriers fixed on...

Страница 6: ...ircuit 24 upper bearing for ball bearing screw 25 Siren 26 Blu lamp 27 Red Lamp 28 Green lamp 29 sectional guide 30 Slide 31 upper point limit switch 32 Cable carrier chain system 33 ball bearing nut...

Страница 7: ...process Following inside the hermetic chamber between cover and plate the vacuum is reached in order to remove the air residue between the sandwitch after a membrane lower and exert uniform pressure o...

Страница 8: ...temperature inside the laminator chamber the heating plate is divided in 6 areas with 3 heating resistor and 1 thermocouple probe per area The heating plate is even cooling by a dedicated circuit Fol...

Страница 9: ...FAST CURE ETIMEX the laminator in your possession has been designed such a way that s operated by a single operator who shares the cycle of work and visions successful The technical specifications suc...

Страница 10: ...ions for electrical plant installation 2 4 GROUNDING SYSTEM It is responsibility of the client must be connected to an efficient grounding system 2 5 MACHINE SAFETY SYSTEM MECHANICAL a Protective pane...

Страница 11: ...ain all the equipment necessary for lifting and moving the laminator We recommend that the movement are make by a lift trucks following this instructions a Use a right lift truck has a load capacity s...

Страница 12: ...neumatic connections must be provided by trained personnel Min and Max working Pressure The working pressure is reported on the pneumatic scheme Pmax 8bar Pworking 6bar Air consuming 60l min Pipe type...

Страница 13: ...ator panel buttons LAMIANTOR IS CONTROLED BY A OPERATOR PANEL FASTEN TO A ADJASTUBLE ARM Auxiliary push button This push button turn on the auxiliary circuit after a emergency stop or during the lamin...

Страница 14: ...this page the operator starts the working cycle in automatic mode by the start cycle pushbutton The cycle page contains a PLATE TEMPERATURE submenu where it s possible to monitor the actual plate tem...

Страница 15: ...onds to measuring real value 2 Set it correspond to the setpoint value expected to have reached within a set window time The operator can modify this value but this modify work only in the actual reci...

Страница 16: ...rameters Time in seconds after which laminator stops the cover opening Changing this value you can modify the height of the cover when it s open Overrun Time in ms after closing cover point from limit...

Страница 17: ...of upper chamber with precise and or coarse adjustment Lower vacuum valve Activate ON deactivate OFF the suction valve of lower Lower vacuum valve Activate ON deactivate OFF the outflow valve of lowe...

Страница 18: ...PPLY 24 VDC The current consumption is too high or it s happened a short circuit Verify is some short circuit is occurred and the current consumption after restart the thermal protection ALARM WATER P...

Страница 19: ...fy the time temperature and vacuum vales regarding the lamination cycle The recipe will move forward to the following step only if all the set conditions in the relative fields will be reached In the...

Страница 20: ...rator panel start up and verify the home page appears on the touch 4 Turn to release the red Emergency pushbutton 5 Push the blue button Auxiliary insertion 6 If some alarms appear on operator panel s...

Страница 21: ...scribed The operator panel must be turned on with the home page settled The input water valve must be open The output water valve must be open The compressed entry air pressure regulator should be pla...

Страница 22: ...he valves integrity status The vacuum condition on upper lower chamber must be maintained at least 1 minute The vacuum condition is not retained O ring is damaged or not perfect fit to the surface rep...

Страница 23: ...for every step needed Select the COMMAND page And push the START CYCLE button In the automatic mode the laminator reach the prestart values When the set point values are reached the green lamp will b...

Страница 24: ...el of vacuum pump See vacuum pump handbook attachment 250 Cleaning the slide shoe and slide and greasing with cleaning rag remove any dust and greasing Check cleaning of nut and greasing with cleaning...

Страница 25: ...new membrane above the heating plate and wait for 10 minutes 3 RePositioning the frame and the new membrane at 20mm from the cover Reassemble the frame closing the hook first in the rear side then in...

Страница 26: ...ove the resistor to be replaced 5 Cover with conductive paste the new resistor and insert in the heating plate 6 Restoring the electrical connection and reseal the cap on the electrical contacts 7 Rea...

Страница 27: ...area cover the machine with a protective sheet so as to prevent rain snow and humidity from damaging the structure causing oxidation and rust The floor on which it is placed must be made of washable...

Страница 28: ...USER AND MAINTENANCE HANDBOOK L150A P Energy P Energy P Energy P Energy 28 30 8 MECHANICAL COMPONENT LIST FIG 1...

Страница 29: ...USER AND MAINTENANCE HANDBOOK L150A P Energy P Energy P Energy P Energy 29 30 FIG 2...

Страница 30: ...rane frame 1 2 2 19 Bakelite support 12 21 Connector group 12 22 sheet guard of heating plate 2 2 23 Scheet support 12 24 Resistor 18 25 Membrane 1 26 Front sheet guard 1 1 27 Lateral sheet guard 2 28...