4
EN
10
Now prepare the panels and lines neatly. Using a parachute line spacer helps
with this stage but is not mandatory.
Start by organising the panel 10 and 11 either side of the double apex line.
Now fold panels 9 to 1 on top of panel 10 so that they lay neatly and so that
the lines are organised either side of the apex lines.
140
Start by organising the panel 9 and 10 either side of the double apex line.
Now fold panels 8 to 1 on top of panel 9 so that they lay neatly and so that
the lines are organised either side of the apex lines.
90/95 &
110
Содержание Angel v1
Страница 1: ...v1 v2 Pilots Manual...
Страница 2: ......
Страница 8: ...Skirt Apex Bridle Gores Double Apex Lines Suspension lines Angel Parachute 05...
Страница 23: ...1258 Route de Grasse Le Bar sur Loup 06620 France...