background image

OUTLINE S.R.L.

Via Leonardo da Vinci, 56

25020 Flero (Brescia) Italy

Tel.: +39 030.3581341

Fax +39 030.3580431

[email protected]

www.outline.it

4

3. 

Fix  the  bracket  to  wall,  ceiling  or  suitable  structure.  There  are  five  mounting  holes 

for this purpose. If you are using the clamp, we suggest you use the central hole. 

Please Note that the screws for wall mounting are not provided.

4.  Remove the pin to move and open the arm, 

 

 

 

 

 

 

 

 

 

5. 

Attach  the  cabinet  to  the  bracket,  first 

insert the lower part with the pole 

into the bottom hole of the cabinet, 

 

 

 

 

 

 

 

 

6.  Close the other side of the bracket. It is 

very  important  that  the  buffer  for  flange 

positioning is inside the rail as shown 

by  the  arrow  in  the  figure.  Then  screw 

the Kerl M10 knob into the threaded pin, 

 

 

 

 

 

 

 

7.  Set the angles as desired and tighten the 

withknobs.

Содержание UB-ARN215CX

Страница 1: ...USER MANUAL UB ARN215CX U Shape bracket ...

Страница 2: ...lified personnel that are familiar with the rigging techniques safety recommendations and with the instructions described in this manual All mechanical components are subject to wear and tear over prolonged use as well as corrosive agents impacts or inappropriate use For this reasons users have the responsibility to adopt and adhere to a schedule of inspections and maintenance Key components screw...

Страница 3: ...the loudspeaker itself etc is absolutely forbidden This bracket allows to mount and set the loudspeaker cabinet to various angles It can be mounted directly on wall ceiling or any other suitable surface or even on a truss using a clamp 1 Remove the KERL M10 from the bracket simply by unscrewing the withknob 2 Attach the clamping area to the rail system s first hole and lock it with the appropriate...

Страница 4: ... central hole Please Note that the screws for wall mounting are not provided 4 Remove the pin to move and open the arm 5 Attach the cabinet to the bracket first insert the lower part with the pole into the bottom hole of the cabinet 6 Close the other side of the bracket It is very important that the buffer for flange positioning is inside the rail as shown by the arrow in the figure Then screw the...

Страница 5: ... products without prior notice as a routine result of this phi losophy For this reason any current Outline product may differ in some aspect from its description but will always equal or exceed the original design specifications unless otherwise stated Outline 2021 Operating manual product code Z OMUB ARN215CX Release 20210914 Printed in Italy ...

Отзывы: