10.
There are 2 Main Joist/ Stub Joist
assemblies, complete both now.
Completed
Main Joist/
Stub Joist
connections.
11.
Carefully lift up completed Stub Joist /
Main Joist assembly and place Main Joist
between Side Girders flush against posts
and notch sitting down into girder.
4” long
screws
12.
Attach all Stub
Joists to girders with
1 - 4” screw per Stub
Joist. Screw from
the top down into
girder.
1 - 4” screw
Outdoor Living Today www.outdoorlivingtoday.com [email protected]
Page 6
Completed
Main Joist/
Stub Joist
connections.