GAS LIGHT PATIO HEATER
ASSEmbLy InSTRucTIOnS
mOdELS Td100, Td102, Td104 & Td110
unPAckInG HEATER
Check all items for shipping damage. If heater is damaged, promptly
inform dealer where you bought heater.
Remove all parts from carton. Carefully lay all items out for ease of
access during assembly.
Top Cap
Cabinet
Base
Burner
Assembly
Light Shroud
Screens
Lightpost
Top
Deco Light Shrouds
Lightpost
Panels
Tank
Door
Hardware Packet
You should have the following assembly parts:
Top Cap (1), Burner Assembly (1), Cabinet Base (1), Base (1), Base
Weight (1), Wheel (2), Base Cabinet Door (1), Lightpost Panel (4),
Deco Light Shroud (2), Upper Screen (4), Lightpost Top (1), Propane
Tank Retention Chain (1), Retention Hook (2), Hardware Package
(1) (see pages 8 thru 11 in your owner's manual).
Base
Base
Weight
ASSEmbLy
Estimated assembly time: 60 minutes
Tools required:
• #2 Phillips screwdriver
• 1/2", 5/16" and 7/32" Open end wrenches
Hardware packet provided with heater may contain more parts than
needed for heater assembly.
Hardware packet contains the following items shown on pages 8
through 11 in your owner's manual):
Electronic Ignitor (1), Ignitor Wire (1), Ground Wire (1), Valve Knob
(1), Propane Tank Retention Chain (1), Retention Hook (2), D Bat-
teries (2) and AA Battery (1).
Parts are referenced by designated letter throughout assembly
instructions. Hardware packet contains the following (quantity used
in parenthesis):
Description
Part No.
A 1 1/2" Screw (8)
119619-01
B 7 mm Washer (8)
119600-04
C 5/8" Screw (9)
119619-03
D 5 mm Washer (9)
119600-02
E 5/16" Hex Nut No. 10 (9)
NPC-3C
F 3/8" Screw (20)
119619-06
G 7/32" Hex Nut (20)
NPC-1C
H 3/8" Self tapping screw (34) 119620-02
I 2 1/4" Hex Bolt (2)
HC4-18C
J 12 mm Hex Nut (2)
NPC-5C
A
F
H
B
J
C
D
E
G
I