![Outback GS8048 Скачать руководство пользователя страница 38](http://html1.mh-extra.com/html/outback/gs8048/gs8048_installation-manual_1660745038.webp)
Installation
36
900-0021-01-00 Rev B
Parallel Stacking (Dual-Stack and Larger)
In parallel stacking, two or more inverters are stacked to create a single, common AC bus.
The slave outputs are controlled directly by the master and cannot operate independently.
All inverters share a common input (AC source) and run loads on a common output.
Slave inverters can go into Power Save mode when not in use. The master will activate individual slaves
based on load demand. This reduces idle power consumption and improves system efficiency.
Up to ten inverters may be installed in a parallel arrangement. The example on this page shows three
inverters. The wiring diagram on the next page shows two.
Figure 26 Example of Parallel Stacking Arrangement (Three Inverters)
When installing a parallel system, the following rules must be observed.
Parallel stacking requires the MATE3 system display and a communications manager.
One inverter, and one inverter only, is always the master and is programmed as
Master
. This is the default
setting. (See the MATE3 manual for programming.)
The master must be connected to port 1 of the communications manager. Other inverters must not be
selected as master.
All slave inverters, regardless of number, should be selected as
Slave
during programming.
All overcurrent devices must be sized for 50 Aac or less.
All wiring must be sized for 50 Aac or more.
All output circuit breakers must be sized appropriately for loads and inverter wattage.
The AC input (generator or utility grid) must be 120/240 Vac at 60 Hz (split-phase).
When wiring the AC source to the inverters, local codes may require the inverter circuits to be located at the
opposite end of the panel from the main circuit breaker. This prevents overloading of the AC bus.
24 kVA
120/240 Vac
8 kVA
120/240 Vac
8 kVA
120/240 Vac
8 kVA
120/240 Vac