Installation 

 

20

 

900-0021-01-00 Rev B 

Accessory Mounting   

   

 

 

Figure 9 

Mounting for System Components 

For the FLEXmax charge controller: 

To fit on the Radian inverter’s right side, the FLEXmax 

charge controllers require the FW-CCB or FW-CCB2 

mounting brackets.  To accommodate many possible 

mounting requirements, four sets of mounting holes 

have been provided for the brackets.

 

 

For the MATE3: 

To fit on the Radian inverter’s 

left side, the MATE3 requires 
the FW-MB3 mounting 

bracket. Holes are provided on 

the upper and lower left side 

to attach the FW-MB3.  For 

more information, see the 

FW-MB3 instruction sheet. 

 

For the HUB: 

To fit on the Radian inverter’s left side, 

the HUB uses two mounting holes and 

three knockouts. 

The top of the GS Load Center (GSLC) connects to the bottom of 

the Radian inverter using four keyhole slots.  The keyhole slots fit 

over four screws on the bottom of the inverter that will secure  

the GSLC to the inverter when they are tightened.   
(The long screwdriver recommended on page 18 may  

be needed to reach these screws.)  The GSLC should be  

secured to the wall using screws or wall anchors.  The  

GSLC also makes a mechanical connection to the Radian  

using bus bars that bolt to the inverter’s DC terminals.  Other 
connections are wired as necessary.  For more information on 

these connections, see the 

GS Load Center Installation Manual

Several system components can mount directly onto the Radian 

inverter or the GSLC.  The MATE3 System Display and the HUB 

Communications Manager can easily be mounted on the left side 
of the system.  Up to two FLEXmax 60 or 80 charge controllers can 

be mounted on its right side.  

NOTE

:  The FLEXmax controller requires mounting brackets  

(see below).  The conduit provided with these brackets is long 

enough to wire the FLEXmax directly to the GSLC.  Additional 

conduit may be necessary when mounting on the inverter.  The 
image on the right shows GSLC mounting.  See Figure 2 on page 

12 for other configurations. 

 

NOTE:  

The OutBack FLEXmax Extreme should be installed on the wall to either side of the GSLC 

for direct wiring access and does not require additional brackets. 

 

Содержание GS8048

Страница 1: ...Radian Series Inverter Charger GS8048 Installation Manual...

Страница 2: ...LOSS OR DAMAGE WHETHER DIRECT INDIRECT CONSEQUENTIAL OR INCIDENTAL WHICH MIGHT ARISE OUT OF THE USE OF SUCH INFORMATION THE USE OF ANY SUCH INFORMATION WILL BE ENTIRELY AT THE USER S RISK Warranty Su...

Страница 3: ...ersonnel who meet all local and governmental code requirements for licensing and training for the installation of electrical power systems with AC and DC voltage up to 600 volts Symbols Used Symbol De...

Страница 4: ...ve connection to earth for safety reasons also known as Chassis Ground Protective Earth PE Grounding Electrode Conductor and GEC Grid interactive grid intertie grid tie Utility grid power is available...

Страница 5: ...s CAUTION Equipment Damage Only use components or accessories recommended or sold by OutBack Power Technologies or its authorized agents IMPORTANT Do not attempt to install this equipment if it appear...

Страница 6: ...Do not place combustible or flammable materials within 12 feet 3 7 m of the equipment This product contains relays with moving parts and is not ignition protected Ensure AC DC and ground cable sizes...

Страница 7: ...teries Avoid touching bare skin or eyes while working near batteries If battery acid contacts skin or clothing wash immediately with soap and water If acid enters the eye immediately flood it with run...

Страница 8: ...must meet the requirements of the Canadian Electrical Code National Electrical Code NEC NFPA 70 Current Edition Canadian Electrical Code C22 1 Current Edition Additional Resources The following are re...

Страница 9: ...irect Environmental Protection Agency USA Web site www epa gov recyclecity Email r9 recyclecity epa gov Phone 1 415 947 8000 Monday Friday 8 00 AM to 12 00 PM and 1 00 PM to 4 00 PM PST Keep America B...

Страница 10: ...library recycling recycling_in_canada html Address Office of Waste Management Conservation and Protection Environment Canada Ottawa Ontaro K1A 0H3 Phone 1 819 997 2800 EuroRecycle net Europe The follo...

Страница 11: ...11 Components and Accessories 12 Planning 13 Applications 13 Renewable Energy 14 Battery Bank 14 Generator 15 Maintenance Bypass Switching 16 Installation 17 Location and Environmental Requirements 17...

Страница 12: ...omponents 20 Figure 10 Cover Screws 21 Figure 11 DC Terminals Ribbon Cables and Auxiliary Terminals 22 Figure 12 AC Terminals Ports and Ground Bus 23 Figure 13 Chassis Ground TBB 24 Figure 14 DC Cable...

Страница 13: ...ounts easily with supplied mounting plate All terminals exit at the bottom of the inverter This allows the installer to use a single distribution box The GS Load Center GSLC is specifically designed f...

Страница 14: ...r s Manual Hardware Kit Mounting Bracket Optional Components for Attachment to Radian Inverter MATE3 System Display and Controller FLEXmax 60 or FLEXmax 80 Charge Controller FW MB3 MATE3 bracket FW CC...

Страница 15: ...ng each mode Generator This mode is intended for a wide range of AC sources including generators with a rough or imperfect AC waveform The Radian will charge from the generator even when the generator...

Страница 16: ...are shown on page 25 The maximum length will determine the placement of the battery bank Other local codes or regulations may apply and may take priority over OutBack recommendations Battery Type The...

Страница 17: ...verter Charger Operator s Manual and the MATE3 Owner s Manual Parameters to be programmed may include generator size automatic starting requirements and potential fluctuations in generator AC voltage...

Страница 18: ...n must be simultaneous for all inverters The GSLC bypass kits operate independently not simultaneously and should not be installed in this kind of application Both manual and automatic double pole dou...

Страница 19: ...Radian Series Inverter Charger If more than two Radian inverters are installed side by side with the GSLC the inverters should be separated by at least 0 9 inches 2 3 cm to accommodate the GSLC doors...

Страница 20: ...Use correct fasteners to secure the mounting plate and the Radian inverter charger to the mounting surface OutBack cannot be responsible for damage to the product if it is attached with inadequate fas...

Страница 21: ...is way will prevent it from dislodging from the mounting plate in the event of an earthquake or similar event NOTE The left corner is used for securing the inverter to a stud If the Radian inverter is...

Страница 22: ...d The long screwdriver recommended on page 18 may be needed to reach these screws The GSLC should be secured to the wall using screws or wall anchors The GSLC also makes a mechanical connection to the...

Страница 23: ...as well as several sets of auxiliary terminals Twenty two machine screws are located around the perimeter Remove these screws with a Phillips screwdriver Once they are removed the cover can be lifted...

Страница 24: ...ions See page 29 for details See the MATE3 manual for programming instructions SWITCH INV Receives wires for a manual on off switch to control the inverter See page 28 for instructions NOTE The ON OFF...

Страница 25: ...s from the MATE3 system display and Remote Temp Sensor See page 28 for instructions AC TERMINAL BLOCK Receives AC input wires for two input sources L1 L2 and neutral for each Also receives AC output w...

Страница 26: ...o be removed IMPORTANT OutBack products are not designed for use in a positive grounded system If it is necessary to build this system with OutBack products contact OutBack Technical Support at 1 360...

Страница 27: ...attery positive and negative cables should be no longer than 10 feet 3 meters each to minimize voltage loss and other effects Note information in Table 4 but refer to NEC or applicable codes for absol...

Страница 28: ...inch 1 cm of insulation from the end of each wire Other tools are not required Figure 15 AC Terminals The terminals labeled L1 and L2 Grid are used to connect to the two utility grid hot wires The L1...

Страница 29: ...tral wire from a generator A Ground TBB is also available if multiple ground connections are needed see Figure 13 on page 24 AC Sources The inverter s transfer relay is normally set to provide inverte...

Страница 30: ...connects directly to the HUB s MATE port Inverters plug into ports 1 and above Charge controllers and other devices plug into additional ports after the last inverter is connected See Stacking on pag...

Страница 31: ...ELAY AUX terminals do not incorporate overcurrent protection it is the responsibility of the installer to ensure the circuit is protected Internal failure that results from lack of protection is not c...

Страница 32: ...relay that diverts wind power The relay s coil is connected to the 12V AUX terminals When the AUX function closes the relay based on battery voltage the relay diverts the excess wind power to a water...

Страница 33: ...ercurrent protection A fuse of no larger than 10 amps must be installed to protect the circuit Since the internal circuitry of the RELAY AUX terminals does not incorporate overcurrent protection it is...

Страница 34: ...ware Relay Assembly which is sold for this purpose The relay contacts can serve in place of the generator s start switch The battery shown below is depicted for clarity In most cases it is part of the...

Страница 35: ...tkinsonelectronics com is one company that makes these kits The Atkinson GSCM Mini is intended to work with OutBack inverters NOTE The conversion kit requires a 12 volt signal which the RELAY AUX term...

Страница 36: ...lowing rules must be observed All overcurrent devices in building based installations must be sized for 50 Aac or less All wiring in building based installations must be sized for 50 Aac or more All o...

Страница 37: ...k of units and ports for programming purposes Programming involves using the MATE3 to assign a status and stacking value to the inverter on each port These assignments can be changed at any time as lo...

Страница 38: ...must be observed Parallel stacking requires the MATE3 system display and a communications manager One inverter and one inverter only is always the master and is programmed as Master This is the defau...

Страница 39: ...Installation 900 0021 01 00 Rev B 37 Figure 27 Parallel Wiring...

Страница 40: ...he Radian Series Inverter Charger Operator s Manual The Operator s Manual has steps for system commissioning These include powering up and performing a functional test on the inverter system as well a...

Страница 41: ...ces 27 Parallel Stacked System 36 Single Inverter System 34 Transfer Relay 27 DVM 2 18 E Environmental Requirements 17 ETL 2 F Features 11 FLEXmax 12 20 Front Cover 21 G Generator 13 26 27 29 36 Contr...

Страница 42: ...onal 3 Stacking 35 Parallel 36 Switch 22 28 Symbols Used 1 System Display 3 36 38 T Temperatures 17 Terms and Definitions 2 Test 38 Three Phase 26 Tools Required 18 Torque Requirements DC Terminals 25...

Страница 43: ...THIS PAGE INTENTIONALLY LEFT BLANK...

Страница 44: ...Corporate Headquarters 17825 59th Avenue N E Suite B Arlington WA 98223 USA 1 360 435 6030 European Office Hansastrasse 8 D 91126 Schwabach Germany 49 9122 79889 0 900 0021 01 00 Rev B...

Отзывы: