background image

10

8

4) 

Outside the orthosis: 

Push a new elastic

band through the opening.

9

5) 

Inside the orthosis: 

Push the new elastic

band in place around the pin.

10

6) 

Outside  the  orthosis: 

Pull  on  the  elastic

band to test if it is secured properly.

7)  Re-attach the lining (see page 7).

Содержание 24H1 MyCRO Band

Страница 1: ...Instructions for use qualified personnel 2 24H1 MyCRO Band For prescription use only...

Страница 2: ...er The shipping latch is securely in place when the orthosis is received The scope of delivery is complete The orthosis is not damaged The orthosis fits the child Caregiver is able to put the orthosis...

Страница 3: ...r damage and proper seating prior to each application to reduce the potential for the elastic band to slip out of place which could create a choking hazard Evaluate the structural integrity and fit of...

Страница 4: ...inders and heat may be used to make small adjust ments to the orthosis NOTICE Note that the heat during the flaring or grinding may cause permanent discoloration Prior to making adjustments the lining...

Страница 5: ...r bathing or treatment by a physiotherapist Wearing the orthosis can cause increased perspiration during the first two to three weeks This is normal and decreases over time If treatment is required fo...

Страница 6: ...g objects or items near the head Any lotions or creams being used have been absorbed by the skin The orthosis is in proper condition with no cracks or other damage The lining fits inside the orthosis...

Страница 7: ...s If the orthosis does not fit correctly or has shifted Repeat the previous steps 7 2 Removal INFORMATION Redness of the skin after removing the orthosis is not unusual and should go away within 2 hou...

Страница 8: ...mooth and securely fastened to the microhooks to avoid pressure points due to bunching of the lining Position the lining at the closure of the orthosis Carefully unroll the lining press ing it into th...

Страница 9: ...sure is intended to last the lifetime of the orthosis If the elast ic band needs to be replaced during treatment use the following instructions Prerequisite Orthosis is taken off 1 Remove the lining f...

Страница 10: ...a new elastic band through the opening 9 5 Inside the orthosis Push the new elastic band in place around the pin 10 6 Outside the orthosis Pull on the elastic band to test if it is secured properly 7...

Страница 11: ...ironment Observe the information provided by the responsible authorities in your country regarding return collection and disposal procedures 10 Legal information All legal conditions are subject to th...

Страница 12: ...Ottobock 647G1539 all_US 07 2208 Otto Bock HealthCare LP 3820 West Great Lakes Drive Salt Lake City UT 84120 USA T 1 800 328 4058 F 1 800 655 4963...

Отзывы: