FRACTIONAL SERIES AERATING FOUNTAIN ASSEMBLY
STEP 1
– FASTEN BRACKETS TO FLOAT
STEP 2
– PLACE POWER UNIT BETWEEN BRACKETS
STEP 3
– POSITION UNIT & TIGHTEN BOLTS
STEP 4
– INSTALL STRAIN RELIEF CABLE TIES
STEP 5
– ATTACH LIGHTING (OPTIONAL)
TIE JUNCTION &
CABLE UNDER
FLOAT & INSIDE
SCREEN WHEN
USED
ALIGN FLATS ON
HOUSING RING
TO BRACKETS
USE 10mm SOCKET
Max. Torque
8N-m / 70in-lb
TRIM EXCESS
CABLE TIE
USE 10mm SOCKET
w/ EXTENSION
Max. Torque
8N-m / 70in-lb
FLOAT BRACKET
LOWER HOLE SET
FOR HIGH VOLUME
ALL OTHER SPRAY
PATTERNS USE
UPPER HOLE SET
SNAP COLORED
LENSE ONTO LEGS
(OPTIONAL)
SNAP FIXTURE
INTO POCKET
OTTERBINE BAREBO INC.
www.otterbine.com
1-800-AER8TER
75-0009 Rev 01 50Hz Fractional Series
Page 5