![OTT HydroMet KIPP & ZONEN SMP12 Скачать руководство пользователя страница 27](http://html1.mh-extra.com/html/ott-hydromet/kipp-and-zonen-smp12/kipp-and-zonen-smp12_operating-manual_1658822027.webp)
Assembly | 5
SMP12 Smart Pyranometer | EN
27
5 Assembly
5.1 Installation for measuring global radiation
5.1.1 Choosing a site
There should be no obstructions to the field of vision above the pyranometer’s sensor element. If this is not
possible, the location of the pyranometer must be chosen to ensure that obstacles do not rise by more than
5 degrees above the azimuth range between sunrise after the shortest night and sunset on the longest day.
The 5 degrees correspond to a minimum distance from the pyranometer to the obstacle of 10 times the height
of the obstacle:
h
>10 x h
Fig. 2:
Minimum distance from pyranometer to obstacle
The minimum distance is important for measuring the direct radiation. The diffuse solar radiation is not so
affected by obstacles near the horizon. An obstacle to the field of vision that rises 5 degrees over the entire
azimuth range of 360 degrees reduces the diffuse radiation directed downwards by only 0.8%.
4
Position the pyranometer in such a way that no shadows fall on it, for instance from masts.
4
Avoid hot exhaust gases with a temperature of over 100 °C in the proximity of the pyranometer. The
radiation can cause measurement deviations.
4
Do not position the pyranometer in front of light-colored walls or any other objects that reflect the
sunlight or emit short-wave radiation.
Содержание KIPP & ZONEN SMP12
Страница 3: ...US English 4 Deutsch 38 Fran ais 72 Italiano 106 Espa ol 140 174 SMP12 Smart Pyranometer 3...
Страница 177: ...1 SMP12 Smart Pyranometer ZH 177 IC ICES 003 B B ICES 003 B NMB 003 B 1 4 i 4 1 4 2 1 2...
Страница 178: ...1 178 SMP12 Smart Pyranometer ZH 1 5...
Страница 179: ...2 SMP12 Smart Pyranometer ZH 179 2 4 4 2 1 4 4 4 2 2 SMP12 4 SMP12 2 3 4 4 OTT HydroMet...
Страница 180: ...2 180 SMP12 Smart Pyranometer ZH 2 4 4 4 4 4 2 5 60 4 2 6 4 4 4 OTT HydroMet 4...
Страница 181: ...3 SMP12 Smart Pyranometer ZH 181 3 3 1 SMP12 Modbus RS 485 PLC...
Страница 189: ...4 SMP12 Smart Pyranometer ZH 189 4 5 2 Smart Explorer 4 Smart Explorer...
Страница 190: ...4 190 SMP12 Smart Pyranometer ZH 4 Setup 4 4 Update...
Страница 191: ...4 SMP12 Smart Pyranometer ZH 191 4 5 3 4 Setup Connection 4 Serial RTU protocol RS 485 4 COM Windows...
Страница 192: ...4 192 SMP12 Smart Pyranometer ZH 4 4 Confirm 4 5 4 4 Configuration...
Страница 195: ...4 SMP12 Smart Pyranometer ZH 195 4 5 5 4 Connections Single Instrument Use 4 Modbus Send Broadcast...
Страница 196: ...4 196 SMP12 Smart Pyranometer ZH 4 Start From Boot 4 1 Connections 4 Configuration 4 10...
Страница 197: ...5 SMP12 Smart Pyranometer ZH 197 5 5 1 5 1 1 5 5 10 h 10 x h 2 360 5 0 8 4 4 100 4...
Страница 198: ...5 198 SMP12 Smart Pyranometer ZH 5 1 2 8 mm 8 mm 65 mm 1 2 3 4 5 1 M5 80 mm 2 2 2 3 5 2 mm 2 4 2 5 2 4 4 2 3 mm 4 4 4...
Страница 199: ...5 SMP12 Smart Pyranometer ZH 199 4 50 4 4 4 4 4 4 4...
Страница 200: ...5 200 SMP12 Smart Pyranometer ZH 5 2 2 1 1 1 2 2 4 4 4 198 4 4 4 4...
Страница 201: ...5 SMP12 Smart Pyranometer ZH 201 5 3 R S D 1 2 5 3 4 H 1 2 3 4 5 5 D 2 S R2 H2 0 1 H 1 99 10 H 4 4 1 2...
Страница 202: ...5 202 SMP12 Smart Pyranometer ZH 5 4 0 1 1 2 3 6 4 5 1 2 3 4 5 6 4 198 4 201...
Страница 203: ...5 SMP12 Smart Pyranometer ZH 203 5 5 5 3 1 2 4 3 1 2 3 4 5...
Страница 204: ...5 204 SMP12 Smart Pyranometer ZH 4...
Страница 205: ...6 SMP12 Smart Pyranometer ZH 205 6 6 1 4 4 4 4 4 4 2 4 OTT HydroMet 6 2 OTT HydroMet 4 OTT HydroMet OTT HydroMet...
Страница 206: ...6 206 SMP12 Smart Pyranometer ZH 6 3 ElektroG 2012 19 EU OTT HydroMet 4 4 4...
Страница 207: ...7 SMP12 Smart Pyranometer ZH 207 7 7 1 4 4 12 24 V 4 4 4 4 OTT HydroMet...