background image

- 6 -

S-plan WIRING LAYOUT

RESET    

  RE

SET

M2

1

2

3

4

RESET    

  RE

SET

M2

1

2

3

4

THERM-O-DISC

1 2

E

2

3

1

T6360B

B1

Br

G

O

G/Y

3

5

7

3

4

N

L

E

N

L

E

N

L

ST6400

Boiler

Pump

3

2

1

3

2

3

2

2

2

3

1

V4043H

Zone Valve (DHW)

(supplied)

Thermal Cut Out/Thermostats

(supplied)

Isolated Mains

Supply From

Fused Spur

L N E

Zone Valve (Htg)

(not supplied)

Room

thermostat

6

9

B1

Br

G

O

G/Y

2

3

1

V4043H

4

8

10

L

N

RESET    

  RE

SET

M2

1

2

3

4

RESET    

  RE

SET

M2

1

2

3

4

THERM-O-DISC

1 2

E

2

3

1

T6360B

B1

Br

G

O

G/Y

3

5

7

3

4

N

L

E

N

L

E

N

L

ST6400

Boiler

Pump

3

2

1

3

2

3

2

2

2

3

1

V4043H

Room 'stat

Zone Valve (DHW)

(supplied)

Thermal Cut Out/Thermostats

(supplied)

Isolated Mains

Supply From

Fused Spur

L N E

Zone Valve (Htg)

(not supplied)

6

9

B1

Br

G

O

G/Y

2

3

1

V4043H

4

8

10

L

N

Thermistor wire

Connected to 

boiler control system

Thermistor

Wiring for 

Standard Boiler

Wiring for Thermistor 

Controlled Boiler

Pump 

flow

2-port valve

(supplied)

Zone valve

(not supplied)

Automatic 

bypass

Radiators/

UFH

Boiler

Electrical spare parts:

Immersion Heater 

71259

Thermostats 80030

Piping 

Diagram

OSO Ecoline cylinders

can  be  fitted  with  all  types  of 

boilers. 

Standard boilers operate using 

room and cylinder thermostats. 

Please  follow  upper  diagram: 

‘Wiring for Standard Boiler’. 

Many popular boilers now use a 

thermistor principle. A thermistor 

temperature sensor is supplied 

with the boiler to attach to the 

cylinder. Temperature informa-

tion is relayed back to the boiler 

control system. 

A clip is provided to secure the 

sensor on the EcoLine cylinder. 

The supplied motorised valve 

must be used in accordance with 

Building Regulation G3. This is 

wired from the thermal cutout on 

the cylinder thermostat. 

Please  follow  lower  diagram: 

‘Wiring for Thermistor Controlled 

Boiler’.

Both wiring plans shown is 

based on the use of a 10-way 

Junction Box (Honeywell Part 

no. 42002116-001). 

Junction Box terminal 8 is 

switched live and, if needed, ter-

minal 10 is pump live. 

Содержание ECOLINE COIL RI

Страница 1: ... 8 0 8 0 8 0 8 142049 02 09 2015 This cylinder is manufactured and approved in accordance with EN 12897 2006 This manual gives detailed advice for installation and should be read carefully prior to fitting any unvented unit This OSO cylinder must be installed by a competent person and be installed in compliance with the OSO Installation and Maintenance Instructions all current legislation codes of...

Страница 2: ... 9 Indirect Control Thermostat 80030 10 Cold Feed Tube Not supplied see Table 2 11 Hot Water Outlet 3 4 BSP 12 Elbow Drain Cock 250445 13 Cable Entry 14 Electrical Box 15 Discharge Pipe Not supplied 16 Motorized Valve Not Factory Fitted 92000 17 Expansion vessel AX 12 18 or 24 18 Clip for Thermistor Size Lenght of tube ø22 mm Exp vessel pre charge 120 600 3 bar 150 800 3 bar 180 800 3 bar 210 900 ...

Страница 3: ...uired to a shower or bidet over rim type only remove the blanking cap from the pressure reducing valve 3 and connect to the shower or bidet cold supply Do not use this balanced cold outlet to feed all cold outlets 10 Connect the cold supply to the PRV 3 11 Fit the expansion vessel to the wall close to the water heater using the enclosed mounting bracket Connect the expansion vessel to the PRV as s...

Страница 4: ...e and Pressure Relief Valve 5 to ensure free water flow through discharge pipe Turn knob to left COMMISSIONING Product Max design Operating pressure Pressure drop primary heater Temp pressure Safety valve Exp vessel ref pressure CW feed coil coil relief valve Pressure conn capacity 120 6 bar cw in 3 bar coil 2 5 0 03 bar 90 95 C 10 bar 6 bar 15mm 1 2 12 l 150 6 bar cw in 3 bar coil 2 5 0 05 bar 90...

Страница 5: ...ining screw is fitted Motorised valve To comply with regulations governing the installation of indirect unvented cylinders a motorised valve must be fitted in the primary flow or return Your OSO unit has been supplied with a two port motorised valve which will act as a positive energy cut out should the safety cut out operate The motorised valve will also control the temperature of the domestic st...

Страница 6: ...r Thermistor Controlled Boiler Pump flow 2 port valve supplied Zone valve not supplied Automatic bypass Radiators UFH Boiler Electrical spare parts Immersion Heater 71259 Thermostats 80030 Piping Diagram OSO Ecoline cylinders can be fitted with all types of boilers Standard boilers operate using room and cylinder thermostats Please follow upper diagram Wiring for Standard Boiler Many popular boile...

Страница 7: ...all types of boilers Standard boilers operate using room and cylinder thermostats Please follow upper diagram Wiring for Standard Boiler Many popular boilers now use a thermistor principle A thermistor temperature sensor is supplied with the boiler to attach to the cylinder Temperature informa tion is relayed back to the boiler control system A clip is provided to secure the sensor on the Ecoline ...

Страница 8: ...ew is fitted 4 If still out of operation contact installer It is a condition of the guarantee that annually a competent person a Inspects and cleans the line strainer b Checks the operation of the expansion relief valve and temperature pressure relief valve c Recommissions the cylinder in accordance with the instructions above Corrosion resistance Stainless steel is naturally corrosion resistant t...

Страница 9: ...re Relief Valve operated due to excess temperature 1 Cold water inlet pressure Reducing Valve not working 1 Check and open stop cock 2 Turn off water supply Remove strainer and clean see Pressure Reducing Valve page 8 3 Check and refit as required see item 3 page 5 of this manual 1 Turn off water supply Open cold tap Remove strainer and clean see Press ure Reducing Valve page 8 in this manual 2 Fi...

Страница 10: ... 10 Repressurize expansion ves sel Follow recommissioning instructions on page 4 Reduced expansion volume OSO FAULT FINDING GUIDE ...

Страница 11: ... 11 OSO FAULT FINDING GUIDE Hot water from taps is cold Insufficient hot water when boiler is used If problem persists contact a competent engineer plumber ...

Страница 12: ...6 systems so that any installation discharging can be traced reasonably easily The single common discharge pipe should be at least one pipe size larger than the largest individual discharge pipe to be connected For further information contact your Building Control Office or The British Board of Agrément FIGURE 5 1 Secondary Return Fitting 2 Non Return Valve 3 Circulation Pump 4 Secondary Return Li...

Страница 13: ...g Regulations 3 Failure to install and commission this appliance to the manufacturer s instructions may invalidate the guarantee The above does not affect your statutory rights For full details on the HWA charter please visit http www hotwater org uk HEATING AND HOTWATER INFORMATION COUNCIL IT IS THE RESPONSIBILITY OF THE INSTALLER TO COMPLETE THIS LOG BOOK AND PASS IT ON TO THE CUSTOMER FAILURE T...

Страница 14: ...cordance with European Council Directive 98 83 EC or revised version at the date of installation and is not fed with water from a private supply Particular Chloride content Max 250 mg l Sulphate content Max 250 mg l Combination Chloride sulphate Max 300 mg l in total 2 The OSO cylinder is filled with water before turning the electricity supply on to the heater elements 3 The log book certificate i...

Страница 15: ...CHARGE TESTED IS PRIMARY ENERGY SOURCE CUT OUT FITTED NORMALLY 2 PORT VALVE WHAT IS THE PRESSURE REDUCING VALVE SETTING IF FITTED WHERE IS OPERATING PRESSURE REDUCING VALVE SITUATED NO YES NO YES NO bar HAS THE EXPANSION VESSEL OR INTERNAL AIR SPACE BEEN CHECKED YES NO WHAT IS THE HOT WATER TEMPERATURE AT THE NEAREST OUTLET C bar ALL PRODUCTS YES DOES THE HOT WATER SYSTEM COMPLY WITH THE APPROPRIA...

Страница 16: ...NATURE DATE ENGINEER NAME SERVICE 5 COMPANY NAME TEL No COMMENTS SIGNATURE DATE ENGINEER NAME SERVICE 7 COMPANY NAME TEL No COMMENTS SIGNATURE DATE ENGINEER NAME SERVICE 9 COMPANY NAME TEL No COMMENTS SIGNATURE DATE ENGINEER NAME SERVICE 2 COMPANY NAME TEL No COMMENTS SIGNATURE DATE ENGINEER NAME SERVICE 4 COMPANY NAME TEL No COMMENTS SIGNATURE DATE ENGINEER NAME SERVICE 6 COMPANY NAME TEL No COMM...

Отзывы: