SECTION 7 - GENERAL SPECIFICATIONS & OPERATOR MAINTENANCE
7-20
– JLG Lift –
3121769
2.
Tighten nuts in the following sequence:
3.
The tightening of the nuts should be done in stages. Follow
-
ing the recommended sequence, tighten nuts per wheel
torque chart.
4.
Wheel nuts should be torqued after first 50 hours of opera
-
tion and after each wheel removal. Check torque every 3
months or 150 hours of operation.
Table 7-14. Wheel Torque Chart
TORQUE SEQUENCE
1st Stage
2nd Stage
3rd Stage
70 ft. lbs.
(95 Nm)
170 ft. lbs.
(225 Nm)
300 ft. lbs.
(405 Nm)
Содержание JLG H800AJ
Страница 28: ...SECTION 1 SAFETY PRECAUTIONS 1 14 JLG Lift 3121769 NOTES ...
Страница 37: ...SECTION 2 USER RESPONSIBILITIES MACHINE PREPARATION AND INSPECTION 3121769 JLG Lift 2 9 ...
Страница 48: ...SECTION 2 USER RESPONSIBILITIES MACHINE PREPARATION AND INSPECTION 2 20 JLG Lift 3121769 ...
Страница 72: ...SECTION 3 MACHINE CONTROLS AND INDICATORS 3 24 JLG Lift 3121769 NOTES ...
Страница 82: ...SECTION 4 MACHINE OPERATION 4 10 JLG Lift 3121769 LEVEL GRADE SIDE SLOPE Figure 4 4 Grade and Sideslopes ...
Страница 94: ...SECTION 4 MACHINE OPERATION 4 22 JLG Lift 3121769 Figure 4 7 Tow Bar ...
Страница 120: ...SECTION 4 MACHINE OPERATION 4 48 JLG Lift 3121769 ...
Страница 124: ...SECTION 5 EMERGENCY PROCEDURES 5 4 JLG Lift 3121769 ...
Страница 158: ...SECTION 7 GENERAL SPECIFICATIONS OPERATOR MAINTENANCE 7 22 JLG Lift 3121769 NOTES ...
Страница 160: ...SECTION 8 INSPECTION AND REPAIR LOG 8 2 JLG Lift 3121769 Table 8 1 Inspection and Repair Log Date Comments ...
Страница 162: ......
Страница 163: ......