background image

  Matrix Installation and Operation Manual 

 

 ______________________________________________________________________________ 25 

5.1.3

 

REPLACING THE DOOR GASKET 

It  is  important  to  maintain  the  gasket  in  good  condition.  After  a  year  or  more  of  use,  the  door 
gasket  will  compress  and  become  hard,  which  may  allow  air  to  leak  past  it.  You  can  test  the 
condition of the door gasket by closing and latching the door on a strip of paper. Test all around 
the door. If the paper slips out easily anywhere, it is time to replace the gasket.  

Use  the  correct  replacement  gasket that  you  can  purchase  from  your  retailer.  The  diameter  and 
density of the gasket is important to getting a good seal. 

Place the door face-down on something soft like a cushion of rags or piece of carpet. Remove the 
old  gasket  from  the  door  by  pulling  and  prying  it  out  with  an  old  screw  driver.  Then  use  the 
screwdriver to scrape the old gasket adhesive from the door. Now run a 1/4” (6 mm) bead of high 
temperature silicone in the door gasket groove. Starting from the middle of the hinge side, press 
the gasket into the groove. Do not stretch the gasket as you place it. Leave the gasket about 1/2” 
long when you cut it and press the end into the groove. Tuck any loose fibres under the gasket and 
into the silicone. Close the door and do not use the stove for 24 hours. 

5.1.4

 

REPLACING THE GLASS GASKET AND/OR THE GLASS 

It  is  a  good  idea to  replace  the  glass  gasket  when the  door  gasket  is  replaced. The  gasket  is  flat, 
adhesive-backed, woven fibreglass. Remove the glass retaining screws (A) and clips (B) then both 
metal frames (C) that holds the glass (D) to the door frame (E). Lift out the glass and pull off the 
old gasket. This is a good time to clean the glass thoroughly. 

 

The gasket must be centred on the edge of the glass. To do this easily, peel back a section of the 
paper covering the adhesive and place the gasket on a table with the adhesive side up. Stick the 
end  of  the  gasket  to  the  middle  of  one  edge,  then  press  the  edge  of  the  glass  down  onto  the 
gasket,  taking  care  that  it  is  perfectly  centred  on  the  gasket.  Peel  off  more  of  the  backing  and 
rotate the glass and press the next section onto the gasket. Do not stretch the gasket as you place 
it. Continue until you get to the start and trim the gasket to length. Now pinch the gasket to the 
glass  in  a  U  shape,  all  around  the  glass.  Reinstall  the  glass,  being  careful  to  centre  the  glass 
carefully  in  the  door.  Do  not  over-tighten  the  screws.  Note  that  the  two  main  causes  of  broken 
door glass are uneven placement in the door and over-tightening of retaining screws. 

Содержание MATRIX OB02020

Страница 1: ...ve Builder International Inc 250 rue de Copenhague St Augustin de Desmaures Quebec Canada G3A 2H3 After sale service 418 908 8002 E mail tech sbi international com This manual is available for free do...

Страница 2: ...chase When this stove is not properly installed a house fire may result To reduce the risk of fire follow the installation instructions Contact local building or fire officials about restrictions and...

Страница 3: ...d the Environment 11 2 5 1 What is Your New Stove Made Of 11 3 Fuel 12 3 1 Materials That Should Not be Burned 12 3 2 How to Prepare or Buy Good Firewood 12 3 2 1 What is Good Firewood 12 3 2 2 Tree S...

Страница 4: ...5 2 3 Cleaning the Chimney 27 PART B INSTALLATION 28 6 Safety Information 28 6 1 Summary of Installation Cautions and Warnings 28 6 2 Regulations Covering Stove Installation 28 7 Clearances to Combust...

Страница 5: ...r 41 8 6 1 Installation of Single Wall Chimney Connector 41 Appendix 1 Reversing the Door Opening and Adjusting the Handle 44 Appendix 2 Installing the Decorative Panels 46 Appendix 3 Installing the F...

Страница 6: ...MAY BE OPEN OR FIRE SCREEN REMOVED ONLY DURING LIGHTING PROCEDURES OR RELOADING ALWAYS CLOSE THE DOOR OR PUT BACK THE FIRE SCREEN AFTER IGNITION DO NOT LEAVE THE STOVE UNATTENDED WHEN THE DOOR IS OPEN...

Страница 7: ...verage CO 8 137 4 g h Recommended heating area and maximum burn time may vary subject to location in home chimney draft heat loss factors climate fuel type and other variables The recommended heated a...

Страница 8: ...30 CFM Particulate emission standard EPA CSA B415 1 10 USA standard safety UL 1482 UL 737 Canadian standard safety ULC S627 East west through the door you see the longitudinal sides of the logs north...

Страница 9: ...Matrix Installation and Operation Manual _______________________________________________________________________________9...

Страница 10: ...cated in the part of the house where the family spends most of its time This is normally the main living area where the kitchen dining and living rooms are located By locating the stove in this area y...

Страница 11: ...the environment 2 5 1 WHAT IS YOUR NEW STOVE MADE OF The body of your stove which is most of its weight is carbon steel Should it ever become necessary many years in the future almost the entire stove...

Страница 12: ...of North America usually have only spruce birch and poplar other low density species to burn and yet they can heat their homes successfully Homeowners with access to both hardwood and softwood fuel so...

Страница 13: ...take years to dry enough to burn Even when dried unsplit logs are difficult to ignite because they don t have the sharp edges where the flames first catch Logs as small as 3 75 mm should be split to e...

Страница 14: ...spruce and poplar aspen can be dry enough to burn after being stacked in the open for only the summer months hardwoods like oak maple and ash can take one or even two years to dry fully especially if...

Страница 15: ...ce wet wood hisses and sizzles in the fire and dry wood does not You could buy a wood moisture meter to test your firewood 3 3 MANUFACTURED LOGS Do not burn manufactured logs made of wax impregnated s...

Страница 16: ...the paint cures some of the chemicals vaporize The vapors are not poisonous but they do smell bad Fresh paint fumes can also cause false alarms in smoke detectors So when you first light your stove b...

Страница 17: ...TER IGNITION After the kindling fire has mostly burned you can add standard firewood pieces until you have a fire of the right size for the conditions 4 3 2 THE TOP DOWN FIRE The top down fire startin...

Страница 18: ...re to rise after a new load of wood is ignited and for its temperature to gradually decline as the fire progresses This rising and falling of temperature can be matched to your household routines For...

Страница 19: ...coal that can stay hot for several days If the ashes are disposed of by burial in soil or otherwise locally dispersed they should be retained in the closed container until all cinders have thoroughly...

Страница 20: ...be a surge of heat from the stove This heat surge is welcome when the room temperature is a little lower than desirable but not welcome if the space is already warm Therefore allow each load of wood t...

Страница 21: ...ire is good for mild weather when you are around to tend the stove and should provide enough heat for four hours or more Small fires like this are a good time to use softer wood species so there will...

Страница 22: ...urs 1 5 c f to 2 0 c f 5 to 6 hours 2 0 c f to 2 5 c f 6 to 8 hours 2 5 c f to 3 0 c f 8 to 9 hours 3 0 c f 9 to 10 hours Long burn times are not necessarily an indication of efficient stove operation...

Страница 23: ...when the stove is cool by wiping with a damp cloth or paper towel and then drying Never try to clean the glass when the stove is hot In spring and fall when the stove is run at lower temperatures you...

Страница 24: ...box Therefore the gasket should be inspected periodically making sure to obtain an air tight fit Air tightness can be improved with a simple latch mechanism adjustment To increase the pressure on the...

Страница 25: ...end into the groove Tuck any loose fibres under the gasket and into the silicone Close the door and do not use the stove for 24 hours 5 1 4 REPLACING THE GLASS GASKET AND OR THE GLASS It is a good id...

Страница 26: ...with fine sand paper wipe it down to remove dust and apply two thin coats of paint For best results use the same paint that was originally used on the stove which is available in spray cans See your d...

Страница 27: ...brush Contact your local municipal or provincial fire authority for information on how to handle a chimney fire Have a clearly understood plan to handle a chimney fire 5 2 3 CLEANING THE CHIMNEY Chim...

Страница 28: ...MNEY FLUE SERVING ANOTHER APPLIANCE MAY BE INSTALLED IN A MOBILE HOME THIS MOBILE HOME APPROVED STOVE REQUIRES INSTALLATION OF A FRESH AIR KIT SOLD SEPARATELY WARNING DO NOT INSTALL IN SLEEPING ROOM W...

Страница 29: ...ues flyers magazines and or web sites it is important to refer to it in order to have a safe and compliant installation In addition you will find information about your stove model serial number etc Y...

Страница 30: ...e new distance of the pipe to combustible materials must be respected in the appropriate certification of the pipe Clearances for mobile homes MOBILE HOME APPLIANCE CLEARANCES INSTALLATION WITH DOUBLE...

Страница 31: ...Matrix Installation and Operation Manual ______________________________________________________________________________31...

Страница 32: ...een the floor protections in Canada and in the United States FLOOR PROTECTOR CANADA USA G 8 203 mm Note 1 N A Canada only H 8 203 mm N A Canada only I 18 457 mm From door opening 16 406 mm From door o...

Страница 33: ...hield construction to match each letter to a clearance Adhesives used in shield construction must not ignite or lose adhesive qualities at temperatures likely to be encountered Mounting hardware which...

Страница 34: ...Matrix Installation and Operation Manual 34______________________________________________________________________________ Clearances for shield construction...

Страница 35: ...Ceramic tiles or equivalent non combustible material on non combustible board spaced out at least 25 mm 1 in by non combustible spacers 50 18 in 33 24 in Ceramic tiles or equivalent non combustible ma...

Страница 36: ...chimney having a diameter of at least 5 inches Canada only or no more than 7 inches is permitted if it allows the proper venting of combustion gases and that such application is verified and authoriz...

Страница 37: ...s to be connected to a 6 in diameter double wall factory built chimney conforming to CAN UCL S629 Standards for 650 C Factory built chimney The total length of the flue system should be at least 12 fe...

Страница 38: ...cross sectional area than a round 6 flue it should be relined with a suitably listed 6 stainless steel liner Do not downsize the flue to less than 6 unless the venting system is straight and exceeds 2...

Страница 39: ...fire burning This means that when you light a fire the initial smoke goes up the chimney and strong draft builds quickly as the chimney flue warms up Although they are common in North America chimneys...

Страница 40: ...weather However to protect against the risk of smoke spillage due to house depressurization a carbon monoxide CO detector alarm is required in the room in which the stove is installed The CO detector...

Страница 41: ...e wall may draw hot exhaust gases from the stove backwards through the duct to outdoors Check the outdoor air duct for soot deposits when the full system is cleaned and inspected at least once each ye...

Страница 42: ...Matrix Installation and Operation Manual 42______________________________________________________________________________ Use 45 degree elbows where possible instead of 90 degree elbows...

Страница 43: ...for expansion straight assemblies should include an inspection wrap with one end unfastened or a telescopic section Minimum upward slope towards the chimney 20 mm m 1 4 in ft One end of the assembly...

Страница 44: ...lf of this feature Remove the top decorative stones A Then the decorative top B by lifting the side of the flue and sliding it towards the back to release it from the front linkage Remove the screw J...

Страница 45: ...the 2 washer S and the assembled balled latch T and the cylindrical pin U Unscrew the 2 bolts N that holds the handle guide O in place Remove the spacers P Unscrew the lock nut V first and then the sh...

Страница 46: ...VE PANELS To install the decorative panels follow the steps below Remove the top decorative stones A Then the decorative top B by lifting the side of the flue and sliding it towards the back to releas...

Страница 47: ...nels insert the bottom decorative trim F then complete the assembly by alternating panels G and decorative trim H by sliding them into the spaces K and L For the installation of stone panels first ins...

Страница 48: ...ation and Operation Manual 48______________________________________________________________________________ Tighten screws C in order to secure the panels assembly Reinstall the decorative top and dec...

Страница 49: ...T This stove may be connected to a fresh air intake kit sold separately When installed with a fresh air kit the stove must be anchored to the floor Parts needed to complete the connection are A 4 1 2...

Страница 50: ...es and bring it close to the door opening Lean the upper part of the fire screen against the top door opening making sure to insert the top fire screen brackets behind the primary air deflector as in...

Страница 51: ...the space it is intended to heat You can also install the quick connect thermodisc kit included with your stove to enable the blower to start or stop automatically when the stove is hot or too cold Ch...

Страница 52: ...erature approximately one hour before turning it on The increased airflow from the blower cools the firebox and could affect the start up combustion efficiency if the blower is turned on too early CAU...

Страница 53: ...tube into the rear right channel hole Then lift and insert the left end of the tube into the rear left channel 2 Align the notch in the left end of the tube with the key of the left air channel hole...

Страница 54: ..._____________ Note that secondary air tubes B can be replaced without removing the baffle board A Important Notes The air tubes are identified for placement as follows Model Type of tube Matrix stove...

Страница 55: ...Matrix Installation and Operation Manual ______________________________________________________________________________55 APPENDIX 7 EXPLODED DIAGRAM AND PARTS LIST...

Страница 56: ...MECHANISM SPACER 1 11 30238 TWO WAY LOCKNUT HEX 10 24 ZINC 1 12 AC09168 DOOR LATCH KIT MATRIX 1 13 PL65622 LATCH SPACER 2 14 SE65742 HANDLE GUIDE ASSEMBLY 1 15 30093 BOLT 1 4 20 X 3 4 HEX GRADE 5 2 1...

Страница 57: ...EMBLY 115V 60Hz 56W 130PCM 1 55 60013 POWER CORD 96 X 18 3 type SJT 2 56 44070 CROSSFLOW BLOWER 115V 60Hz 56W B 1 57 AC02055 QUICK CONNECT THERMODISC KIT 1 58 44046 THERMODISC F110 20F 1 59 OA10701 SO...

Страница 58: ...rt or unit after inspection and investigation of the defect The manufacturer may at its discretion fully discharge all obligations with respect to this warranty by refunding the wholesale price of any...

Отзывы: