HORIZON – Installation and Operation Manual
53
7.6.2
Exterior offset installation
7.6.3
Installation instructions
WARNING
•
THE STRUCTURAL INTEGRITY OF THE FLOOR, WALL, AND CEILING/ROOF MUST BE MAINTAINED.
•
THE FLOOR AND WALLS BELOW THE ATTIC MUST BE INSULATED USING THE SAME INSULATION.
A
To insure a good draft, it is
recommended to have a length of 18
inches from the top of the unit to the
first offset. However, starting using a
30° or 45° elbow is also approved.
B
Mandatory measure of 15 ft. from the
bottom of the fireplace to the top of
the outside chimney.
Содержание Horizon OB04010
Страница 10: ...10 HORIZON Installation and Operation Manual 2 3 Measurements...
Страница 11: ...HORIZON Installation and Operation Manual 11...
Страница 50: ...50 HORIZON Installation and Operation Manual...
Страница 74: ...74 HORIZON Installation and Operation Manual...
Страница 75: ...HORIZON Installation and Operation Manual 75 APPENDIX 9 EXPLODED DIAGRAM AND PARTS LIST...
Страница 80: ...80 HORIZON Installation and Operation Manual...