
3. Mounting instructions
Ortlieb Präzisionssysteme GmbH & Co. KG • Jurastraße 11 • 73119 Zell unter Aichelberg • Germany
13
Tel.: +49 (0) 7164 797 01-0 • Fax.: +49 (0) 7164 797 01-51 • e-mail: [email protected] • www.ortlieb.net
3.4 Check run-out
It is necessary to adjust the clamping device in order to provide best possible run-out results.
Therefore loose the mounting screws between main-body of the chuck and the flange. Check the
TIR with a dial indicator in the taper of the pressure sleeve or main-body. After adjusting the chuck,
do not forget to retighten the mounting screws with the proper torque.