Orlanski ORLIGNO 500 Скачать руководство пользователя страница 13

5. Maintenance.

Ash created during pellet burning is deposited  in the bottom chamber. Bottom chamber needs to 

be cleaned once a month with  tools: scraper, cleaning shield. It is advisable to clean heat exchanger 

at least once a month to assert  permeability of pipes.

 If fumes temperature exceeds max. value which  will be displayed it is necessary to clean heat 

exchanger pipes and boiler. 

 Once a week burner need to be checked thoroughly because of possibility of depositing unburned 

parts of pellets (especially when pellet quality is bad) which may block pellet feeding and cause 

uncontrolled burning.

 

Attention! 

If unproper pellet issue will repeat it is necessary to fully open blower’s screen.

12

13

a) disassembly the door

b) loosen the adjusting nut

c) turn the hinge at 360° 

d) tighten up an adjusting nut.

Steps for door correct regulation:

adjusting nut

 

Warning! 

Regulation should be made on both upper and bottom hinges at the same time. All 

threaded door parts should be greased periodically (for exemple with a grease or an 

oil) as well as hinges.

In order to clean heat exchanger:

1. Open upper door

2. Unscrew two nuts with M13 wrench ( they secure heat exchanger’s plate behind which  

horizontal pipes are placed).

3. Remove turbulators and clean pipes with shield and turbulators with brush.

4. Place turbulators back into the heat exchanger.

 

Attention! 

If unproper pellet issue will repeat it is necessary to fully open blower’s screen.

Содержание ORLIGNO 500

Страница 1: ...ORLIGNO 500 INSTRUCTION MANUAL SERVICE MANUAL...

Страница 2: ...n 3 2 Description of the controller 3 2 1 Lightning up 5 3 Controller s menu description 6 3 1 Menu handling 6 3 2 Alarm status and safety devices 11 4 Feed system 12 4 1 Feed system alarm status 12 4...

Страница 3: ...s Thanks to semiconductor transmitters power of the blower is fluently adjusted thus increasing reliability of control system of feeder s engine Automatic burning up Controller enables automatic burni...

Страница 4: ...Pic 1 Controller s menu 4...

Страница 5: ...e is in standby mode and is still live In case of alarm controller will activate all pumps or feeders ATTENTION It is forbidden to use for boiler lightning up any flammable substances If boiler is in...

Страница 6: ...tion from user menu will automatically be changed on SIMPLE ATTENTION Instruction manual contains all control parameters available both in SIMPLE or ADVANCED menu Parameters from ADVANCED menu are wri...

Страница 7: ...de Boiler s temperature is automatically set depending on heat demand Manual mode Boiler s temperature is set by user Service parameter informing about next boiler maintenance Hysteresis only in ADVAN...

Страница 8: ...erature during hot water heating i e if programmed temp of hot water 60 C and boiler h w 10 C then programmed temperature during heating hot water is 70 C PARAMETERS Progr kept temperature in heating...

Страница 9: ...er than 20 minutes pre set and programmed temperature of hot water is not reached central heating pump will start working on 5 minutes Parameters available in service menu stop central heating pump wi...

Страница 10: ...NTION Buffer menu is only available in ADVANCED menu PARAMETERS Burner power available in two modes auto recommended and manual In auto mode controller selects burner power accordingly to energy deman...

Страница 11: ...ode If temperature do not exceed alarm temperature it will not be remembered in controller s memory no fuel fire Alarm is activated in case of lack of fuel or fire in the burner feeder overheating Ala...

Страница 12: ...h a way that flame from burner is not able to get to the pellet hopper Safe feeding is assured by system of two feeders jointed together with flexible vertical chute Fuel feeding is continually monito...

Страница 13: ...nproper pellet issue will repeat it is necessary to fully open blower s screen 13 a disassembly the door b loosen the adjusting nut c turn the hinge at 360 d tighten up an adjusting nut Steps for door...

Страница 14: ...ta 18 4 4 Electric data of gear motors 19 4 5 Mechanical data of gear motors 19 4 6 Heater s technical data 19 5 Boiler s electric scheme 20 6 Boiler connection 22 6 1 Connection scheme 22 6 2 Hydraul...

Страница 15: ...ollowed according to solid fuel boiler assembly in countries in which the boiler is sold Boiler ORLIGNO 500 is adjusted for installation in pressurized systems Eko Vimar Orlanski Ltd recommends to use...

Страница 16: ...Auto mode 2 Heating temperature 60 C 3 Underfloor heating temperature max 45 C 4 Thermostat 15 C 5 Hot water temperature 45 C 6 Priority yes 7 Hysteresis 2 C 8 Boiler h w 10 C 9 Buffer upper temperatu...

Страница 17: ...L p Description j m Value 1 Boiler output kW 25 2 Power range kW from 7 to 25 3 Boiler class acc norm EN 303 5 3 highest 4 Efficiency 92 5 Fuel pellets lenght diameter moisture content mm mm 10 50 6...

Страница 18: ...on 16 Alarm temp range C 80 95 18 L p Description j m Value 7 Approximate heating space m2 to 250 8 Max working pressure bar 2 5 9 Max water temp C 85 10 Min return water temp C 60 11 Flue diameter mm...

Страница 19: ...nd motor s core test current 3 mA 8 Insulation coefficient 100 M minimum at 500V of voltage measured between coil and cover 9 Thermal protection Motor protected up 120 C 10 Insulation class klasa E 4...

Страница 20: ...20 5 Boiler s electric scheme Pic 3 Electric scheme Pic 3 Electric scheme...

Страница 21: ...u buffer pump connection pump responsible for maintaining right return temperature to the boiler P co central heating pump connection Room thermostat Controller enables to cooperate with any room ther...

Страница 22: ...ee way mixing valve 230V 5 Circulation pump 6 Differential valve 7 Return manifold 8 Radiator 9 Hot water pump 10 Hot water tank 11 Hot water outlet 12 Cold water inlet 13 Pressure tank 14 Safety grou...

Страница 23: ...6 2 Hydraulic connections 6 3 Cooling coil In connection with thermostatic valve BVTS it protects the boiler from overheating Cooling coil needs to be connected to cold water installation through the...

Страница 24: ...n above 1 5 Ventilating duct should be made of non inflammable material 8 2 Exhaust ventilation 1 Exhaust duct should be made of bricks with section of at least 25 of chimney section not less 14 x 14...

Страница 25: ...ice Boiler is fuming Clogged or unproper chimney Get the chimney sweeper opinion Strong wind forces fumes into the chimney Consider installation of devices regulating chimney draught Door is fuming Ga...

Страница 26: ...EC on waste electrical and electronic equipment Symbol placed on the components or attached documents means that appliance is not classified as a household waste Scrapping should take place in specia...

Страница 27: ...27...

Страница 28: ...EKO VIMAR ORLA SKI Sp z o o 48 385 Otmuch w ul Nyska 17b POLSKA woj opolskie T 48 77 400 55 80 81 400 55 91 F 48 77 439 05 03 400 55 96 E biuro orlanski pl www orlanski pl...

Отзывы: