![Orion Welders LZR series Скачать руководство пользователя страница 24](http://html1.mh-extra.com/html/orion-welders/lzr-series/lzr-series_user-manual_1653410024.webp)
24
ATTENTION:
Use only the cables and equipment provided with the machine. Do not substitute
or change any cables or plugs. If needed, contact Sunstone Engineering before
making any changes
Remove the eyepieces from the containers (Picture 10) and fasten them on the machine. Screw the
screw using a 2.5mm allen key and plug the connector.
For steps on aligning the crosshairs, see chapter 7.3.
Picture 10: Eyepieces
Picture 11: Eyepieces Mounted on Ocular tubes
NOTE
As a general practice, to streamline the alignment of the crosshair, the eyepiece
with the crosshair should be placed in the right ocular tube.
5.1: ADDING WATER
NOTE
During the first setup and installation, extra steps are needed to get the machine
functioning. The next steps are only important during the initial setup, or after
changing the water in the machine.
Steps to install water correctly:
1. Insert the plastic connection equipped with the machine (Fig. 1) to the female connector at the
right bottom of the rear panel. (Fig.3)
2. Remove the red plug in upper position. (Fig.3)
3. Use the funnel equipped with the machine to refill the tank. (Fig.2, Fig.4)
Содержание LZR series
Страница 1: ...Orion Laser Welder User Manual Orion LZR ...
Страница 4: ...4 ...