background image

Orenco Systems

®

 • 800-348-9843 • +1 541-459-4449 • www.orenco.com 

NIM-EPS-1
Rev. 6 © 10/21
Page 2

Biotube ProPak and LOS Pump Package Installation Manual

Table of Contents

How to Use This Manual    .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  . Page 2

Before You Begin   .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  . Page 2

Standard On-Lot Components     .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  . Page 3

Installation Overview   .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  . Page 4

Installation Steps   .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  . Page 4

Step 1: Verify Tank Installation   .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  . Page 4
Step 2: Install Tank Adapters and Risers  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  . Page 4
Step 3: Test Tank and Adapter Seams for Watertightness   .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  . Page 5
Step 4: Install Biotube Pump Package .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  . Page 5
Step 5: Connect Pump Discharge to Transport/Service Line   .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  . Page 6
Step 6: Mount and Wire Control Panel .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  . Page 6
Step 7: Test Pump Voltage and Amperage .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  . Page 7
Step 8: Test Float Switches and Control Panel .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  . Page 8
Step 9: Complete the Installation   .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  . Page 8

How to Use This Manual

This manual contains an Installation Overview and a set of Installation Steps. 

• 

Installation Overview

 — This is a simple overview of the steps in the installation process. Its purpose is to help you quickly see the 

suggested order of operations for installing the on-lot components of Orenco Biotube ProPak and LOS (liquid-only sewer) Pump Packages. 
It is intended as a reference only – it does not provide complete instructions. 

• 

Installation Steps

 — This provides general instructions for each step in the installation process and references to installation 

documents for specific components. Many Orenco products come with installation instructions, and all of these instructions are 
available in hardcopy form. Contact your distributor or Orenco for copies, or find instructions online in the Orenco Document Library at  
www.orenco.com. There are also steps in this manual that cover operations performed before and after the pump package is installed, 
which are necessary for successful pump package installation. 

You will find Key Points, Notes, and IMPORTANT information in this manual, marked with easy-to-see visuals: 

Key Points

 — These are critical for a quality installation and must be completed in order for your installation to be successful. 

Notes 

— These cover useful information and tips that can help make your installation simpler or easier. They may also provide 

information on variations in components or methods. 

IMPORTANT 

— These point out potential hazards to equipment or people during and after the installation. 

Before You Begin

Orenco works hard to make your installation as easy as possible. Our pump packages are totally integrated and can be installed in most 
tanks in a matter of hours. All components are designed to fit together well, with a minimum of field cuts. 

Before you begin installing your Orenco pump package, be sure to read this entire manual and any reference documents you may need 
to complete the installation. Also, be sure that the instructions for these products are the most current ones available by checking our 
online Document Library at www.orenco.com. You’ll save time and money on installation day, and you’ll get fewer call-backs.

Содержание Biotube ProPak

Страница 1: ...Installation Manual 1800348 9843 15414594449 www orenco com Biotube ProPak LOS Pump Package Installation Manual 1 800 348 9843 1 541 459 4449 www orenco com...

Страница 2: ...products come with installation instructions and all of these instructions are available in hardcopy form Contact your distributor or Orenco for copies or find instructions online in the Orenco Docume...

Страница 3: ...which is available from your local distributor from Orenco and online at www orenco com products Note All pipe diameters given are US nominal IPS pipe sizes If you re using metric pipe you may need a...

Страница 4: ...grades are met Step 2 Install Tank Adapters and Risers Step 2a Install the tank adapters if they haven t been installed Follow the manufacturer s instructions For Orenco PRTA24 or PRTA30 Tank Adapter...

Страница 5: ...tions to test the seams between the access riser tank adapter and tank for watertightness Key Points Plug the tank s inlet and outlet before testing watertightness Fill the tank with water to a level...

Страница 6: ...y Installation Instructions NIN MF DA 1 Float Switch Settings and Adjustments Instructions IMPORTANT DON T change the float tether lengths Step 5 Connect Pump Discharge to Transport Service Line Glue...

Страница 7: ...a Open the discharge plumbing valve and service connections Step 7b Unsnap the float switch assembly and remove it from the riser If the assembly includes a Redundant Off Low Level Alarm float switch...

Страница 8: ...larm switch in the down position The audible alarm goes silent the panel door alarm light turns off Place the Pump On Off switch in the down position The pump stops running Place the Redundant Off Low...

Страница 9: ...the panel door alarm light turns on Timed Dose Y R W or YG R W Float Switch Assemblies MVP S Control Panels Go to the logo unit s input screen per the instructions supplied in the panel Place the Red...

Страница 10: ...iser Make sure the coils don t tangle with the float switches Step 8e Place the Auto Off Man switch on the control panel to Auto make sure the control panel circuit breakers are in the On position and...

Страница 11: ...Orenco Systems 800 348 9843 1 541 459 4449 www orenco com NIM EPS 1 Rev 6 10 21 Page 11 Biotube ProPak and LOS Pump Package Installation Manual...

Страница 12: ...1 800 348 9843 1 541 459 4449 www orenco com NIM EPS 1 Rev 6 10 21 Orenco Systems Installation Manual Biotube ProPak LOS Pump Package...

Отзывы: