SA ALUMINUM STOP LOG

 

 

 

 

www.orbinox.com

 

 

EDITION 12/2017 

IOM-SA 

4.3.

 

WALL MOUNTED (AT THE END OF THE CHANNEL)

 

 

Step 1: Concrete construction inspection  

 

Check that the concrete wall meets the requirements described in Section 4. 

 

Verify  that  all  installation  material  specified  on  the  GAD  is  available.  The  equipment  is  installed  by  means  of 

anchor  bolts.  Construction  sealant  shall  be  used  between  the  frame  and  the  concrete  wall.  Alternatively,  sponge 
EPDM rubber can be used. 
Step 2: Equipment pre-installation 

 

Present the unit to its required position and ensure that the invert of the frame is flush with the civils.  Also make 

sure that the equipment is centered with respect to the channel opening (See 

Figure 12

). 

 

Drill  and  install  one  anchor  bolt  on  each  side  of  the  frame.  After  installing  the  first  anchor  bolt,  and  prior  to 

drilling the hole on the other side, make sure the frame is perfectly leveled. 
Step 3: Construction sealant application 

 

Remove the unit from the wall (first remove the nuts of the anchor bolts). 

 

Apply construction sealant all around the perimeter of the frame. Be sure not to  get sealant on the gate’s seals 

and/or guides, as this may cause leakage or damage. (See 

Figure 13

). 

 

Re-install the slide gate on the wall and tighten both anchor bolts. 

Step 4: Final installation 

 

Drill and install the rest of the anchor bolts (See 

Figure 14

). 

 

CAUTION!  If  the  unit  is  not  completely  in  contact  with  the  wall,  do  not  over-tighten  the  anchor  bolts.  Over 

tightening may bend or distort the frame. If the wall flatness and levelness is according to the specified standards, 
the construction sealant will fill in the remaining voids.

 

 

Apply construction sealant around the frame perimeter in order to fill in any existing gap between the wall and 

the frame (200ml/meter) Wipe away the excess sealant to leave a smooth finish.

 

 

Содержание ALUMINUM STOP LOG SA

Страница 1: ...INSTALLATION OPERATION AND MAINTENANCE MANUAL ALUMINUM STOP LOG SA...

Страница 2: ...K TOLERANCES 16 1 INTRODUCTION This manual describes the recommended procedures for installation operation maintenance and safety precautions for the following Orbinox equipment o SA Aluminum Stop Log...

Страница 3: ...orbinox com EDITION 12 2017 IOM SA 2 EQUIPMENT MAIN COMPONENTS ITEM DESCRIPTION 1 FRAME 2 LOG 3 VERTICAL SEAL 4 BOTTOM SEAL 5 LATERAL GUIDE 6 LOG LOCKING SYSTEM 7 SEAL AND GUIDE LOCKING SYSTEM 8 INTE...

Страница 4: ...eck the equipment on delivery and report back to Orbinox any missing components within 3 days from receipt of the equipment Orbinox will not accept responsibility for loss or damage to any equipment w...

Страница 5: ...NEL RECESS Step 1 Initial assessment Check that the concrete wall meets the requirements described in Section 4 Verify that all installation materials specified on the GAD are available Wooden wedges...

Страница 6: ...inless steel bolts that secure the vertical guides and seals must be greased on the outside to avoid getting bonded to the concrete Step 2 Anchor the gate to the side of the channel Position the unit...

Страница 7: ...www orbinox com EDITION 12 2017 IOM SA CAUTION Make sure not to get grout or any other foreign material on the gate s seals guides or stem as this may cause leakage or damage Figure 6 Figure 7 Figure...

Страница 8: ...bolt and prior to drilling the hole on the other side make sure the frame is perfectly leveled Step 3 Construction sealant application Remove the unit from the wall first remove the nuts of the anchor...

Страница 9: ...IOM MANUAL SA ALUMINUM STOP LOG www orbinox com EDITION 12 2017 IOM SA Figure 12 Figure 13 Figure 14...

Страница 10: ...eter The maximum deviation should be width 1000 o Verify that the frame invert has been embedded in concrete Wall mounted at the end of the channel installation Verify that there are no voids between...

Страница 11: ...lide Please refer to section 7 1 for detailed information about the required grease type The following equipment can be used to lift up the gate or logs o Hand pull the slide or logs are equipped with...

Страница 12: ...seals and make sure they are not damaged Seals shall be replaced if damaged see section 7 2 Check tightness of all unit assembly bolts and anchor bolts Spare parts Orbinox does not recommend stocking...

Страница 13: ...replacement o Step 1 Remove the log from the frame See Figure 15 part 2 o Step 2 Remove the damaged seals and replace it by the new ones See Figure 16 part 1 Add general purspose Loctite to secure the...

Страница 14: ...ogs from the frame Remove the Seal and guide Locking System Remove the vertical seals and replace by the new ones For stainless steel frames the seals are secured with stainless steel retainers Secure...

Страница 15: ...stall unit repair the concrete wall and re install the unit Insufficient construction sealant refer to the GAD Uninstall the unit clean the concrete wall and apply new construction sealant refer to th...

Страница 16: ...mension Deviations shall be within the tolerances defined in DIN 18202 Deviation Maximun deviation Linear deviation DLx DLy DLyy DIN 18202 table 1 group 2 for DLx and DLy DIN 18202 table 1 group 5 for...

Отзывы: