Installing a 7x20 Cable Management Arm
Installing a 7x20 Cable Management Arm
Use the following procedure to install the optional cable management arm (CMA) for a 7x20
controller.
This procedure is completed from the back of the equipment rack.
Before You Begin
Unpack the CMA and identify its components.
To prepare for installing the optional cable management arm (CMA), follow these guidelines:
■
Route cluster cables, long-term host cables (including InfiniBand, Fibre Channel, and
Ethernet Cables) and up to 12 disk shelf SAS cables through the CMA.
■
Do not route short SAS daisy chain cables through the CMA. Do not route an excess of
cables such that the CMA clamps bow or appear structurally unfit to support the weight.
164
Oracle ZFS Storage Appliance Installation Guide • December 2016
Содержание ZS4-4
Страница 2: ......
Страница 10: ...10 Oracle ZFS Storage Appliance Installation Guide December 2016 ...
Страница 91: ...Installing a DE2 24C Disk Shelf 7 Tighten the two locking screws in the rails Installing Disk Shelves 91 ...
Страница 98: ...98 Oracle ZFS Storage Appliance Installation Guide December 2016 ...
Страница 108: ...108 Oracle ZFS Storage Appliance Installation Guide December 2016 ...
Страница 136: ...136 Oracle ZFS Storage Appliance Installation Guide December 2016 ...
Страница 154: ...154 Oracle ZFS Storage Appliance Installation Guide December 2016 ...
Страница 170: ...170 Oracle ZFS Storage Appliance Installation Guide December 2016 ...
Страница 182: ...182 Oracle ZFS Storage Appliance Installation Guide December 2016 ...
Страница 210: ...210 Oracle ZFS Storage Appliance Installation Guide December 2016 ...
Страница 212: ...212 Oracle ZFS Storage Appliance Installation Guide December 2016 ...