System LEDs
Oracle Server X7-2 Service Manual
Link LEDs
Link activity
Link speed
Operating Temperature
41°F to 95°F (5° to 35°C)
Storage Temperature
-40°F to 154°F (-40°C to 68°C)
Humidity Range
10% to 90% (non-condensing) operating
environment
Network Data Interfaces
8 Gigabit Ethernet Fail-To-Wire Ports
2 1/10-Gigabit Ethernet SFP+ Ports
Other interfaces
1 Gigabit Ethernet Management Port
1 USB 3.0 port
1 RJ-45 Console Port
Installing the Talari Appliance
Rack Mounting
Prior to installing the device, adhere to the following installation guidelines:
•
Ensure that there is adequate airflow in the rack. Restricted airflow can damage the
equipment.
•
Leave at least 1U of vertical space between each device installed in the rack.
•
The rack width and depth should allow for proper serviceability and cable management.
•
Ensure the rack is properly secured to the floor or ceiling.
•
Ensure the rack is properly grounded.
•
Ensure the installer is properly grounded and wearing appropriate safety equipment.
•
Always load the rack from the bottom up.
•
Load the heaviest devices in the rack first.
•
Make sure the rack is level and stable before pulling a device out of the rack.
•
Do not move racks by yourself; at least two people are recommended to move a rack.
•
Cables should be easily identifiable.
Please refer to the Oracle® Servers X7-2 and X7-2L Installation Guide for additional appliance
specifications and detailed rackmounting instructions:
https://docs.oracle.com/cd/E72435_01/
.
LAN/WAN Connections
When connecting each Ethernet cable (LAN, WAN) to the appropriate connector on the D2000.
•
Position the cables carefully, so that they do not put strain on the connectors.
•
Organize cables in bundles such that cables do not intertwine.
•
Inspect the cables to make sure that the routing and bend radii are satisfactory. Reposition
cables, if necessary.
Chapter 1
Installing the Talari Appliance
1-4