background image

System LEDs

See 

Oracle Server X7-2 Service Manual

Link LEDs

Link activity
Link speed

Operating Temperature

41°F to 95°F (5° to 35°C)

Storage Temperature

-40°F to 154°F (-40°C to 68°C)

Humidity Range

10% to 90% (non-condensing) operating
environment

Network Data Interfaces

8 Gigabit Ethernet Fail-To-Wire Ports
2 1/10-Gigabit Ethernet SFP+ Ports

Other interfaces

1 Gigabit Ethernet Management Port
1 USB 3.0 port
1 RJ-45 Console Port

Installing the Talari Appliance

Rack Mounting

Prior to installing the device, adhere to the following installation guidelines:

Ensure that there is adequate airflow in the rack. Restricted airflow can damage the
equipment.

Leave at least 1U of vertical space between each device installed in the rack.

The rack width and depth should allow for proper serviceability and cable management.

Ensure the rack is properly secured to the floor or ceiling.

Ensure the rack is properly grounded.

Ensure the installer is properly grounded and wearing appropriate safety equipment.

Always load the rack from the bottom up.

Load the heaviest devices in the rack first.

Make sure the rack is level and stable before pulling a device out of the rack.

Do not move racks by yourself; at least two people are recommended to move a rack.

Cables should be easily identifiable.

Please refer to the Oracle® Servers X7-2 and X7-2L Installation Guide for additional appliance
specifications and detailed rackmounting instructions: 

https://docs.oracle.com/cd/E72435_01/

html/E72440/index.html

.

LAN/WAN Connections

When connecting each Ethernet cable (LAN, WAN) to the appropriate connector on the D2000.

Position the cables carefully, so that they do not put strain on the connectors.

Organize cables in bundles such that cables do not intertwine.

Inspect the cables to make sure that the routing and bend radii are satisfactory. Reposition
cables, if necessary.

Chapter 1

Installing the Talari Appliance

1-4

Содержание Talari D2000

Страница 1: ...Oracle Talari D2000 Hardware Guide F29960 01 March 2020...

Страница 2: ...e to the programs No other rights are granted to the U S Government This software or hardware is developed for general use in a variety of information management applications It is not developed or in...

Страница 3: ...Codes 1 2 Hardware Specifications 1 3 Installing the Talari Appliance 1 4 Rack Mounting 1 4 LAN WAN Connections 1 4 Cabling and Bypass Mode 1 5 Powering Up the Appliance 1 5 Network Deployment Options...

Страница 4: ...stem Support 3 Select one of the following options For Technical issues such as creating a new Service Request SR select 1 For Non technical issues such as registration or assistance with My Oracle Su...

Страница 5: ...vide any required critical or major trouble notification Any other problem severely affecting service capacity traffic and billing Maintenance capabilities may be defined as critical by prior discussi...

Страница 6: ...e Change June 2019 Initial Release October 2019 Oracle Branding change March 2020 Adds ILOM Snapshot setup and capture procedure Adds Creating bootable USB drive on Windows and Linux procedure Adds Bo...

Страница 7: ...reen resolution of 1024 x 960 or greater is recommended Overview The Oracle Talari D2000 is part of the D series of Talari Appliances and intended for use in data centers that demand high performance...

Страница 8: ...s indicators please see the Oracle Server X7 2 Service Manual Rear Panel Configuration Table 1 1 Ports 1 Gigabit Ethernet Bypass pair with Port 2 2 Gigabit Ethernet Bypass pair with Port 1 3 Gigabit E...

Страница 9: ...4 Ports 9 10 Indicator Location Color Meaning Activity Top Green Off No activity Blinking Packet Activity Link Speed Bottom Amber Off No activity Amber 10 Gbps Hardware Specifications The D2000 has th...

Страница 10: ...d to the floor or ceiling Ensure the rack is properly grounded Ensure the installer is properly grounded and wearing appropriate safety equipment Always load the rack from the bottom up Load the heavi...

Страница 11: ...ce When connecting power to the D2000 Plug the AC power cords into the appliance Plug the AC power cords into an uninterrupted AC power source The appliance will start automatically The D2000 uses 100...

Страница 12: ...to the management interface are required to use Easy 1st Install If one or more are not available please see the instructions for manual installation If the management interface is connected to the L...

Страница 13: ...inistrator must have an active configuration which includes a client package for this site running on the NCN An appropriate IP address subnet mask and gateway for the management interface should be p...

Страница 14: ...e and select the zip package provided by your network administrator then click Upload 12 When the upload is complete click Next to proceed to activation 13 Click Activate Staged to complete the proces...

Страница 15: ...ls bash 4 2 ipmitool sunoem cli set SP network interconnect allowed_services fault transport http https ipmi snmp ssh Connected Use D to exit set SP network interconnect allowed_services fault transpo...

Страница 16: ...025_1907XC3025_2020 03 02T17 50 08 zip Snapshot Complete Done exit Connection to 169 254 182 76 closed bash 4 2 The zip file will be in tmp bash 4 2 ls l tmp zip rw r r 1 talariuser talariuser 1787955...

Страница 17: ...All rights reserved Warning password is set to factory default Warning HTTPS certificate is set to factory default Hostname ORACLESP 1907XC3025 reset system RESET HOST Are you sure you want to reset S...

Страница 18: ...layed in about 2 minutes Figure 1 5 Boot Device Menu 7 Using the Up Down arrows keys position the cursor on your install USB boot device Press the ENTER key to select the USB boot device Figure 1 6 US...

Страница 19: ...1 8 System Booting Using the USB 8 Login to the system with user name root and a password of talari You can set the IP address of the appliance now or you can set it after installation 9 Choose any on...

Страница 20: ...application software on the system When this is complete you are asked to type reboot and remove the USB drive This process takes up to 3 minutes Figure 1 10 Rebooting 10 Type reboot after completion...

Страница 21: ...E0D55EA57419E3C139680956 4317966 848319 usb storage 4 1 1 0 USB Mass Storage device detected 4317966 848421 scsi host6 usb storage 4 1 1 0 4317967 863955 scsi 6 0 0 0 Direct Access Kingston DataTravel...

Страница 22: ...ed as dev sdd This command requires root access and is prefixed with sudo sudo cp d6000v1_OS_7_0_1_0_0_GA_02282020_OS_52_GA_05022019_R8_2_1_0_0_GA_01282020 raw dev sdd The USB burn process on a USB3 d...

Страница 23: ...in the device 8 Click Yes The USB burn process on a USB3 device can take 15 minutes It may take longer if the device or port is USB2 After the process is complete you can remove the USB It is ready f...

Отзывы: