Installing the Switch
25
Unpacking the Chassis
The first part of installing the switch chassis is to unpack it from its shipping
container. Perform the tasks in the following order:
■
“Remove the Shipping Carton Contents” on page 25
■
“Unsecure the Chassis From the Pallet” on page 28
Related Information
■
“Understanding the Installation” on page 15
■
“Preparing the Chassis” on page 29
▼
Remove the Shipping Carton Contents
1. Identify the prerequisite and subsequent tasks you must perform in
conjunction with this procedure, to install the switch.
See the table in
“Installation Sequence” on page 20
2. Ensure that there is adequate space around the switch to maneuver a computer
lifting device.
3. Remove the yellow Customer Information Sheet from the plastic pocket on the
side of the packaging and keep it for future reference.
4. Remove the carton protection pads.
5. Cut the bands from the outer packaging and open the carton.
Содержание Sun Datacenter InfiniBand Switch 648
Страница 1: ...Sun Datacenter InfiniBand Switch 648 Installation Guide Part No 820 7738 12 May 2010 Revision A ...
Страница 8: ...viii Sun Datacenter InfiniBand Switch 648 Installation Guide May 2010 ...
Страница 134: ...124 Sun Datacenter InfiniBand Switch 648 Installation Guide May 2010 ...
Страница 140: ...130 Sun Datacenter InfiniBand Switch 648 Installation Guide May 2010 ...