Preparing for Installation
23
Preparing for Installation
These topics detail the precautions to follow, the tools to assemble, and the tasks to perform
prior to installing the server.
Step
Description
Links
1.
Confirm that you have received all the items you ordered
for the type of CMA you will be using in your installation.
“Shipping Kit (Part Number 7069640)” on page 23
“Shipping Kit (Part Number 350-1662-02)” on page 25
2.
Review ESD and safety precautions.
“Handling Precautions” on page 26
3.
Verify that you have the correct tools.
“Tools Needed for Installation” on page 27
4.
Prepare the server for installation.
“Prepare the Server” on page 28
Related Information
■
■
“Connecting the Server Cables”
■
“Powering On the Server for the First Time”
Shipping Kit (Part Number 7069640)
Verify that you have received all of the components that ship with your server.
This shipping kit includes the single-unit CMA comb. If your shipping kit includes the multi-
piece CMA, see
“Shipping Kit (Part Number 350-1662-02)” on page 25
Note -
When you receive the server, place it in the environment where you will install it. Leave
it in its shipping crate at its final destination for 24 hours. This resting period prevents thermal
shock and condensation.
Содержание SPARC T5-4
Страница 1: ...Part No E29662 10 July 2015 SPARC T5 4 Server Installation Guide ...
Страница 2: ......
Страница 8: ...8 SPARC T5 4 Server Installation Guide July 2015 ...
Страница 10: ...10 SPARC T5 4 Server Installation Guide July 2015 ...
Страница 16: ...16 SPARC T5 4 Server Installation Guide July 2015 ...
Страница 22: ...22 SPARC T5 4 Server Installation Guide July 2015 ...
Страница 66: ...66 SPARC T5 4 Server Installation Guide July 2015 ...
Страница 88: ...88 SPARC T5 4 Server Installation Guide July 2015 ...
Страница 92: ...92 SPARC T5 4 Server Installation Guide July 2015 ...