Install the Cable Management Arm
a.
Align connector C with the slide-rail so that the locking spring (callout 1) is
positioned inside (storage server side) of the right slide-rail [frame 1].
Callout
Description
1
Connector C locking spring
b.
Insert connector C into the right slide-rail until it locks into place with an
audible click [frames 2 and 3].
c.
Gently tug on the right side of the CMA's rear slide bar to verify that
connector C is properly seated.
Installing the Storage Server Into a Rack
47
Содержание EXADATA X6-2
Страница 1: ...Oracle Exadata Storage Server X6 2 Extreme Flash Installation Guide Part No E63688 03 July 2018 ...
Страница 2: ......
Страница 8: ...8 Oracle Exadata Storage Server X6 2 Extreme Flash Installation Guide July 2018 ...
Страница 14: ...14 Oracle Exadata Storage Server X6 2 Extreme Flash Installation Guide July 2018 ...
Страница 24: ...24 Oracle Exadata Storage Server X6 2 Extreme Flash Installation Guide July 2018 ...
Страница 60: ...60 Oracle Exadata Storage Server X6 2 Extreme Flash Installation Guide July 2018 ...
Страница 66: ...66 Oracle Exadata Storage Server X6 2 Extreme Flash Installation Guide July 2018 ...
Страница 70: ...70 Oracle Exadata Storage Server X6 2 Extreme Flash Installation Guide July 2018 ...