• It is recommended to keep the packaging during the guarantee period.
• MBE-300 is designed for business use.
• Must be placed on a strong and sturdy surface.
• If exposed to very low temperatures it should be placed in a room at a normal
temperature for 24 hours before using to avoid condensation on electric surfaces.
•
For user’s Health & Safety the equipment should be supplied power, through
the original cable only. Electric sockets must have an earth and comply with
earthing regulation.
• Voltage rating should be consistent with data on the nameplate on the cover and
in the manual of the equipment. Disobeying this rule can cause electric shock
and fi re, plus cancelling the guarantee.
Before starting to use, install a magnetic guide bar and binding bar supplied,
magnetic guide bar on the binding jaw (for channel 5-32 mm) or in front of the
binding jaw (for channel 1,5mm; 3mm) and binding bar at the back. Now insert
the channel into the binding slot in the correct way, all as shown in the diagrams
below. These bars are specially designed to make inserting the documents and
covers into the channel easily.
In the box, there is a de-binding wedge (Metalbind), which is stored in a slot on
the bottom of housing. In addition, these slots on both sides are used for lifting
and moving around the equipment for safety.
INSTALLATION
4
PDJQHWLF
JXLGHEDU
PDJQHWLF
JXLGHEDU
ELQGLQJVORW
ZLWKFKDQQHO
PDJQHWLF
JXLGHEDU
ELQGLQJVORW
ZLWKFKDQQHO