opticis M5-1002 Скачать руководство пользователя страница 3

 
 
 
 
 
 
 

Installation 
 

Important: Please use the installation procedure below.  Improper, or no 
operation may result if the start-up sequence is not correctly followed. 

 

Step 1 

Carefully unpack the contents of the shipping group. Before next step, ensure 
that your graphic card is set at no higher than SXGA (1,280x1,024) 60Hz in 
direct connection of copper DVI cables. 

 
Step 2  

With system power turned 

off

, connect the Uplink module to the DVI 

receptacle of PC by a DVI copper cable. If necessary, connect the RS232 
cable plugs to each D-sub 9-pin connector on PC and Uplink module. 

 

 

Figure 2 – Connection of DVI and RS232 cables to Uplink module 

 
Step 3 

In the same way as above, connect the Downlink module to the display by 
DVI copper cable. The RS232 devices near the display can be connected  by 
RS232 copper cables also. 

 

 

Figure 3 – Connection of DVI, RS232 cables to Downlink module

 

 
1-3 Installation

 

Step 4  

Remove dust covers and connect a duplex SC fiber to SC receptacles of the 
Uplink and Downlink modules, as shown in Fig. 4.  Carefully ensure the 
duplex SC connector is fully engaged. 

.

 

Figure 4 – Connection of duplex SC fiber

 

 
Notice: 

Please DO NOT look directly into the SC receptacles of both Uplink 

and Downlink modules, while they are powered on, although they are 
regulated strictly enough to operate under the Laser Class I, classified by 
CDRH/FDA for eye safety. 

 
Step 5 

Connect an AC/DC power adapter to both Uplink and Downlink modules as 
your availability of AC outlets. You can find power indication LED lit on in the 
both modules.

 

 

Figure 5 – Connection of AC/DC power adapter

 

Step 6 

Power ON the PC and display or connected RS-232 devices. Ensure the link 
indication LED lit ON, representing secure connection of SC duplex fiber and 
the DVI indication LED in the Uplink module lit ON, representing secure 
connection of the DVI cable.  
 

Tip 1:

 After initial installation as guided in the above, we recommend you to 

power On and Off while all connections are set and the Uplink and Downlink 
modules are powered in.  

Tip 2:

 Avoid “hot plugging” the Uplink as this is not recommended practice 

with live digital voltages. 

 

1-4 Installation (continued)

 

Отзывы: