
32
You need to set inverters after first installation so as to have proper operation
in the future.
After switching on PV and AC (recommend no battery at this moment) of the
first installation, the initial setting frame comes out automatically. The chart is
indicated.
System Connection
This setting is to set single or multiple inverter connection of the system. The
selections are:
1
Single: only one inverter in this system
2
Parallel: The inverter AC mains are connected together; AC loads are
connected together to build up a bigger systemSet Mode
The selections are:
1
Off-grid: for pure off grid operation
2
Net Metering: Grid interactive mode. Extra PV power feeds to grid.
BATTERY CONFI G
Ge ne r i c 100Ah
Ge ne r i c
TAP [ t o Ent e r
MAI NS CHGs BAT
Di s a bl e
Di s a bl e
TAP [ t o Ent e r
RS485 Addr e s s
001
001
TAP [ t o Ent e r
I ni t i a l SETTI NGS
Compl e t e d
FREQUENCY CONFI G
60Hz
60Hz
TAP [ t o Ent e r
BAT 100Ah
TAP [ t o Ent e r
Содержание SP5000 Vitality Eco
Страница 1: ...Installation Operation Manual SP5000 Vitality Eco...
Страница 2: ...This page is intended to be blank...
Страница 7: ...5...
Страница 18: ...16 Keep distance for the airflow to dissipate heat Mounting Procedure 1 2 3...
Страница 24: ...22 Battery sensor Accessory F Protection cover Protection cover From BAT breaker...
Страница 29: ...27...
Страница 31: ...29 Start up Procedure...
Страница 57: ......