
Transport, unpacking, setting up
If the device is brought from a cold environment into the operating room, condensati-
on may occur. Please wait until the device has reached the correct temperature and is
absolutely dry before putting it into operation. The acclimatization time depends on
the temperature difference and the device as well as its construction. However, it
should be at least 12 hours.
Please wear protective gloves during installation to avoid the risk of injury. Before
mounting the hood, prepare the necessary tools.
For the installation of the hood, the customer must provide the prerequisites for a
smooth installation of the hood and cover kitchen appliances.
Prepare a suitable exhaust air duct, if necessary open false ceiling, partition walls,
kitchen block, create openings etc...
14
EN
6. ASSEMBLY PREPARATION
Содержание FONDA PRO
Страница 1: ...FONDA PRO Installation manual EN NL Installation manual Montagehandleiding...
Страница 2: ......
Страница 13: ...11 EN 580 830 R 3 5...
Страница 15: ...Duct terminal changeable 13 EN...
Страница 25: ...n o FRONT BACK EN 23...
Страница 26: ...7 Insert FONDA align create silicone joint EN 24...
Страница 29: ...10 Install silencers EN 27 1 2 3 1 2 3...
Страница 36: ......
Страница 47: ...45...
Страница 49: ...NL Kanaalterminal verwisselbaar 13 47...
Страница 59: ...NL VOORKANT RUG O n 23 57...
Страница 60: ...NL 7 FONDA plaatsen uitlijnen siliconenverbinding maken 24 58...
Страница 63: ...NL 10 Installeer geluiddempers 3 2 1 1 2 3 27 61...
Страница 70: ...35...