![Opal Opal-10K-3P-EU Скачать руководство пользователя страница 40](http://html1.mh-extra.com/html/opal/opal-10k-3p-eu/opal-10k-3p-eu_user-manual_1639193040.webp)
7. Limita�on of Liability
In addi�on to the product warranty described above, the state and local laws and regula�ons
provide financial compensa�on for the product's power connec�on (including viola�on of implied
terms and warran�es). The company hereby declares that the terms and condi�ons of the
product and the policy cannot and can only legally exclude all liability within a limited scope.
- 38 -
The 1st priority power of the system is always the PV power, then 2nd and
3rd priority power will be the ba�ery bank or grid according to the se�ngs.
The last power backup will be the Generator if it is available.
Mode III: With Smart-Load
Mode IV: AC Couple
Grid
Backup Load
On-Grid Home Load
Battery
Solar
CT
AC cable
DC cable
Smart Load
Grid
Backup Load
On-Grid Home Load
Battery
Solar
On-Grid+AC couple
AC cable
DC cable
On-Grid Inverter
CT