background image

- 32 -

Recommended ba�ery se�ngs

Battery Type 

AGM (or PCC) 

Absorption Stage 

14.2v (57.6v)

13.4v (53.6v)

Float Stage

Torque value

(every 30 days 3hr )

14.2v(57.6v)

Gel

14.1v (56.4v)

13.5v (54.0v)

Wet

14.7v (59.0v)

13.7v (55.0v)

14.7v(59.0v)

Lithium

Follow its BMS voltage parameters

5.7 System Work Mode Setup Menu

Zero Export To Load

Max Solar Power

Zero Export To CT

Max Sell Power 

Energy pattern

BattFirst

LoadFirst

System Work Mode

Solar Sell

Solar Sell

12000

12000

Power

8000

Zero-export Power

20

Selling First

Work

Mode1

Grid Peak Shaving

Work Mode

Selling First:

 

This Mode allows hybrid inverter to sell 

back any excess power produced by the solar panels to 

the grid. If �me of use is ac�ve, the ba�ery energy also 

can be sold into grid. 

The PV energy will be used to power the load and charge 

the ba�ery and then excess energy will flow to grid.

Power source priority for the load is as follows:

1. Solar Panels.

2. Grid.

3. Ba�eries (un�l programable % discharge is reached).

Zero Export To Load:

 Hybrid inverter will only provide power to the backup load connected. The hybrid 

inverter will neither provide power to the home load nor sell power to grid. The built-in CT will detect 

power flowing back to the grid and will reduce the power of the inverter only to supply the local load and 

charge the ba�ery.

Zero Export To CT:

 

Hybrid inverter will not only provide power to the backup load connected but also give 

power to the home load connected. If PV power and ba�ery power is insufficient, it will take grid energy 

as supplement. The hybrid inverter will not sell power to grid. In this mode, a CT is needed. The installa�on 

method of the CT please refer to chapter 3.6 CT Connec�on. The external CT will detect power flowing back 

to the grid and will reduce the power of the inverter only to supply the local load, charge ba�ery and home 

load.

Grid

Backup Load

On-Grid Home Load

Battery

Solar

Grid

Backup Load

On-Grid Home Load

Battery

Solar

CT

Содержание Opal-10K-3P-EU

Страница 1: ...Hybrid Inverter User Manual Opal 8K 3P EU Opal 6K 3P EU Opal 5K 3P EU Opal 10K 3P EU Opal 12K 3P EU OPAL...

Страница 2: ...11 Typical application diagram of diesel generator 3 10 Wiring diagram 3 12 phase parallel connection diagram 6 Mode 37 38 5 6 Battery Setup Menu 5 7 System Work Mode Setup Menu 5 8 Grid Setup Menu 5...

Страница 3: ...u want to disconnect AC or DC terminals Please refer to Installa on sec on of this manual for the details Grounding instruc ons this inverter should be connected to a permanent grounded wiring system...

Страница 4: ...on bu ons 5 DC switch 4 Power on o bu on 6 Parallel port 7 Meter 485 port 8 Ba ery input connectors 9 Func on port 10 ModeBUS port 11 BMS port 12 PV input with two MPPT 13 Grid 15 Generator input 14 L...

Страница 5: ...03 2 2 Product Size Inverter Size Moun ng bracket 363...

Страница 6: ...d Suppor ng WIFI monitoring and build in 2 strings for 1 MPP tracker 1 string for 1 MPP tracker Smart se able three stages MPPT charging for op mized ba ery performance Time of use func on Smart Load...

Страница 7: ...ave received the items in the following package Wall moun ng bracket x1 Hybrid inverter x1 Parallel communica on cable x1 L type Hexagon wrench x1 Stainless steel an collision bolt M8 80 x4 User manua...

Страница 8: ...the television Antenna or antenna cable Not higher than al tude of about 2000 meters above sea level Not in environment of precipita on or humidity 95 Considering the following points before selec ng...

Страница 9: ...e careful when li ing out from the package Choose the recommend drill head as shown in below pic to drill 4 holes on the wall 52 60mm deep 1 Use a proper hammer to t the expansion bolt into the holes...

Страница 10: ...ery and the inverter In some applica ons switching devices may not be required but over current protectors are s ll required Refer to the typical amperage in the table below for the required fuse or c...

Страница 11: ...with a suitable cable is important for safe and e cient opera on of the system To reduce the risk of injury refer to Chart 3 2 for recommended cables All wiring must be performed by a professional pe...

Страница 12: ...the GEN signal is ac ve the open contact GS will switch on no voltage output G valve 3 4 reserved Grid_Ry 5 6 RSD 7 8 When ba ery is connected and the inverter is in ON status it will provide 12Vdc Pa...

Страница 13: ...1 2 Temp CT 11 3 3 3 Temperature sensor connec on for lead acid ba ery Inverter...

Страница 14: ...urely disconnected during maintenance and fully protected from over current The recommended of AC breaker for the load port is 20A for 8kw 32A for 10kw and 32A for 12KW The recommended of AC breaker f...

Страница 15: ...o output to protect your appliance but some mes it s ll causes internal damage to the air condi oner Before connec ng to PV modules please install a separately DC circuit breaker between inverter and...

Страница 16: ...o the inverter Safety Hint Please don t connect PV array posi ve or nega ve pole to the ground it could cause serious damages to the inverter Safety Hint Before connec ng inverter please make sure the...

Страница 17: ...re listed as follows a Strip o the DC wire about 7mm disassemble the connector cap nut see picture 5 3 b Crimping metal terminals with crimping pliers as shown in picture 5 4 c Insert the contact pin...

Страница 18: ...panel will generate voltage high voltage in series may cause danger to life Therefore before connec ng the DC input line the solar panel needs to be blocked by the opaque material and the DC switch s...

Страница 19: ...on White wire 5 4 3 6 7 8 Black wire Grid N R S T CT1 CT2 CT3 17 GRID N R S T PE CT Arrow pointing to inverter Note when the reading of the load power on the LCD is not correct please reverse the CT a...

Страница 20: ...ter Three Phase Smart Meter SET ESC 1 7 4 10 25 24 3 9 6 10 RS 485 CHNT DTSU666 3 6 9 10 1 4 7 10 R S T Grid R R S S T T N N Parallel_A Parallel_B Meter 485 port RS485A RS485B Grid Eastron meter Eastr...

Страница 21: ...ra ons of the Wi Fi Plug 3 7 Earth Connec on mandatory Ground cable shall be connected to ground plate on grid side this prevents electric shock if the original protec ve conductor fails Note When the...

Страница 22: ...E S T PE T R N S PE T T AC Breaker Hybrid Inverter CT1 CT2 CT3 RCD Home Loads RCD E BAR N BAR E N Link Grid Battery BMS DC Breaker PV DC Breaker This diagram is an example for an applica on that neutr...

Страница 23: ...al 8K 3P EU 250A DC breaker Opal 10K 3P EU 300A DC breaker Opal 12K 3P EU 300A DC breaker AC Breaker for grid Opal 5K 3P EU 63A AC breaker Opal 6K 3P EU 63A AC breaker Opal 8K 3P EU 63A AC breaker Opa...

Страница 24: ...breaker Opal 12K 3P EU 300A DC breaker Opal 5K 3P EU 150A DC breaker Opal 6K 3P EU 200A DC breaker Opal 8K 3P EU 250A DC breaker DC Breaker for battery Opal 10K 3P EU 32A AC breaker Opal 8K 3P EU 20A...

Страница 25: ...3 slave Inverter No 2 slave Inverter No 1 master Ground Ground Ground Battery pack Home Load R S T N PE R S T N PE CT Arrow pointing to inverter DC Breaker for battery Opal 5K 3P EU 150A DC breaker O...

Страница 26: ...d Display Panel The opera on and display panel shown in below chart is on the front panel of the inverter It includes four indicators four func on keys and a LCD display indica ng the opera ng status...

Страница 27: ...bu on you can enter into the system setup screen which including Basic Setup Ba ery Setup Grid Setup System Work Mode Generator port use Advanced func on and Li Ba info 4 The main screen showing the...

Страница 28: ...in Screen Solar Page Solar Graph Grid Graph BMS Page Load Graph Battery Setting System Work Mode Grid Setting Gen Port Use Basic Setting Advanced Function Device info Grid Page Inverter Page Battery P...

Страница 29: ...Battery PV1 PV2 Grid Inverter Today 0 5 KWH Total 1 60 KWH L1 220V P1 19W L2 220V P2 18W L3 220V P3 18W Load Energy This is Back up Load detail page Press the Energy bu on will enter into the power c...

Страница 30: ...ar Total System Grid Power Total CANCEL Day Month Year Total Mean Voltage 50 34V Charging Voltage 53 2V Total Current 55 00A Discharging Voltage 47 0V Mean Temp 23 5C Charging current 50A Total SOC 38...

Страница 31: ...Factory Reset Reset all parameters of the inverter Lock out all changes Enable this menu for se ng parameters that require locking and cannot be set up Before performing a successful factory reset an...

Страница 32: ...rrent that the Grid charges the Ba ery Grid Charge It indicates that the grid charges the ba ery This is Grid Charge you need select Batt Mode Lithium Use Batt V Battery Setting Activate Battery Max A...

Страница 33: ...ow this value Low Ba 20 It indicates the inverter will alarm if the SOC below this value Restart 40 Ba ery voltage at 40 AC output will resume This page tells generator output voltage frequency power...

Страница 34: ...the load is as follows 1 Solar Panels 2 Grid 3 Ba eries un l programable discharge is reached Zero Export To Load Hybrid inverter will only provide power to the backup load connected The hybrid invert...

Страница 35: ...ll discharge the ba ery un l the SOC reaches 80 During 15 00 18 00 when ba ery SOC is higher than 40 hybrid inverter will discharge the ba ery un l the SOC reaches 40 During 18 00 01 00 when ba ery SO...

Страница 36: ...g L HVRT L HFRT HV2 0 0V HV1 0 0V LV1 0 0V LV2 0 0V LV3 0 0V 0 16S 0 16S 0 16S 0 16S 0 16S HF2 0 00HZ HF1 0 00HZ LF1 0 00HZ LF2 0 00HZ 0 16S 0 16S 0 16S 0 16S Grid Set4 Please select the correct Grid...

Страница 37: ...a Ba ery SOC at which the Smart load will switch on simultaneously and then the Smart load will switch on On Grid always on When click on Grid always on the smart load will switch on when the grid is...

Страница 38: ...it the inverter will provide the redundant part to ensure that the generator will not overload DRM For AS4777 standard Backup Delay Reserved BMS_Err_Stop When it is ac ve if the ba ery BMS failed to c...

Страница 39: ...0 0 4 5 0 00V 0 00A 0 0C 0 0 0 0Ah 0 0V 0 0A 0 0 0 0 00V 0 00A 0 0C 0 0 0 0Ah 0 0V 0 0A 0 0 0 0 00V 0 00A 0 0C 0 0 0 0Ah 0 0V 0 0A 0 0 0 0 00V 0 00A 0 0C 0 0 0 0Ah 0 0V 0 0A 0 0 0 0 00V 0 00A 0 0C 0 0...

Страница 40: ...cannot and can only legally exclude all liability within a limited scope 38 The 1st priority power of the system is always the PV power then 2nd and 3rd priority power will be the ba ery bank or grid...

Страница 41: ...nute and then turn on the DC AC switch 6 Seek help from us if can not go back to normal state AC side over current fault 1 Please check whether the backup load power and common load power are within t...

Страница 42: ...re firmly and correctly connected 3 Seek help from us if can not go back to normal state F29 Parallel CAN Bus fault 1 When in parallel mode check the parallel communication cable connection and hybrid...

Страница 43: ...mmunication between hybrid inverter and battery BMS disconnected when BMS_Err Stop is active 2 if don t want to see this happen you can disable BMS_Err Stop item on the LCD 3 If the fault still exists...

Страница 44: ...e to the following reasons Damage during transporta on of equipment Damage caused by incorrect installa on or commissioning Damage caused by failure to comply with opera on instruc ons installa on ins...

Страница 45: ...PT Range V Start up Voltage V PV Input Current A No of MPPT Trackers No of Strings Per MPPT Tracker AC Output Data 2 mes of rated power 10 S Lead acid or Li lon 40 60V 3 Stages Equaliza on yes Self ad...

Страница 46: ...munica on with BMS Weight kg Size mm Installa on Style Warranty 45 60 45 Dera ng 45 dB A Smart cooling RS485 CAN 33 6 422W 699 3H 279D IP65 5 years Wall mounted CEI 0 21 VDE AR N 4105 NRS 097 IEC 6211...

Страница 47: ...e ni on of RJ45 Port Pin for Meter 485 1 No 2 3 4 5 6 7 8 METER 485_B Meter 485 Pin METER 485_A COM GND COM GND METER 485_A METER 485_B Meter 485 Port 1 2 3 4 5 6 7 8 1 2 3 4 5 6 7 8 87 65 43 21 1 2 3...

Страница 48: ...46 RS232 WIFI RS232 1 No D GND WIFI RS232 2 3 4 5 6 TX 7 12Vdc 8 1 2 3 4 5 6 7 8 9 RX 9 This RS232 port is used to connect the wi datalogger...

Страница 49: ...47 1 Split Core Current Transformer CT dimension mm 2 Secondary output cable length is 4m 10 Appendix II Lead Outside...

Страница 50: ...Ver 2 2 2022 02 23 OPAL ENERGY PTE LTD ADD 18 Boon Lay Way 06 107 Trade Hub 21 Singapore 609966 Tel 65 6515 4780 Fax 65 6515 4758 Email service opalenergy com sg Website www opalenergy com sg...

Отзывы: