NT09-401 ENGLISH v.2.0
3
MAINTENANCE
➢
Before and after operating, place a few drops of SAE #10 into inlet bushing with throttle lever pressed down to allow
lubricating oils to properly dispense through machine.
➢
Connect the compressed air pipe and run for a few seconds, the tool for oil distribution on the tool.
NOTE
: it is Possible the yield of oil through the exhaust hole. To prevent the ingress of oil on the workpiece and / or of the
operator to close the exhaust hole with a rag.
STORAGE
➢
Avoid storing the instrument in conditions of high humidity.
➢
Lubricate the tool before long-term storage (see MAINTENANCE).
ITEM DESIGN HANGE
It is forbidden to make changes to the design of the tool without the consent of the manufacturer.
DISPOSAL
When disposing of the tool or individual components, observe the local regulations in force in the region where the equipment
is used.
THE AIR SUPPLY SYSTEM
➢
For maximum performance and durability of parts, the operating inlet pressure should be set at 6,2 bar.
➢
Recommended diameter of the compressed air hose 3/8" (≈ 9 mm).
➢
Always use clean, dry air.
➢
Drain the water from the air line before starting work. Install a filter drier in the air line.
➢
Maintain the necessary supply of compressed air in the air line for trouble-free and optimal tool performance.
Содержание NT09-401
Страница 10: ...NT09 401 v 2 0 10 ...
Страница 12: ...NT09 401 v 2 0 12 ...