ONE100D/M
Chapter 7
Installation Guide
Powering up the ONE100D/M
60
7
Powering up the ONE100D/M
Power up
To power up the ONE100D/M, always follow these steps:
• Connect the DC power input jack from the power supply to the DC power input of the rear panel of
the router.
• Connect the power supply to the AC mains (100-240 V AC).
Self test
A few seconds after the power is switched on, the ONE100D/M performs a series of self-tests and loads
the software into memory (RAM), during which the
Status
LED on the front panel blinks.
At the end of the software loading, after about 30 seconds, if:
• the
Status
LED remains green continuously, it means that the software initialization was successful.
• the
Status
LED blinks, it means that:
- the software was absent,
or,
- there was an error during the software loading process.
Refer to the OneOS User Manual for more information.
Содержание ONE100D/M
Страница 1: ...ONE100D M Installation Guide Version 1 0 500944 19 December 2007...
Страница 5: ...ONE100D M Table of contents Installation Guide 5...
Страница 11: ...ONE100D M Chapter 1 Installation Guide Safety instructions 11...
Страница 35: ...ONE100D M Chapter 3 Installation Guide Router description 35...
Страница 49: ...ONE100D M Chapter 4 Installation Guide Interface description 49...
Страница 53: ...ONE100D M Chapter 5 Installation Guide Technical characteristics 53...
Страница 59: ...ONE100D M Chapter 6 Installation Guide Installing the ONE100D M 59...
Страница 61: ...ONE100D M Chapter 7 Installation Guide Powering up the ONE100D M 61...
Страница 62: ...ONE100D M Annex 62 Annex...
Страница 63: ...ONE100D M Annex 63...
Страница 65: ...ONE100D M Annex A Annex Console cable 65...