5. When concrete completely solidified, use crane to hang tyre killer
into the foundation. Level the device with level ruler. Tyre killer
should 1mm higher than road surface. Equipment bottom gaps need
be filled and smoothed by concrete, prevent concrete flow into
equipment.
(Attention: Be sure the tyre killer rising direction)
6. Connect tyre killer wire to electronic control system.
7. Secondary evenly pouring concrete around the equipment, prevent
concrete entering the equipment. Shake concrete with electric
concrete vibrator to reduce the gap. If the equipment changes
position when pouring , have to promptly adjusted. After the
adjustment, continue to construction and finish the second pouring
work.
8. Connect button panel.
9. According to the scene to restore the area.
Operation
Remote Controller
Switch is on the side of remote control.
Total four buttons on remote controller. A(Up), B(Down), C(Stop),
D(Spare Key).
Содержание 2Z-ATK-6M
Страница 1: ...Automatic Tyre Kille 2Z ATK 6M r Manual ...