
Installation
Materials Preparation
1. Cutting machine (for to break road);
2. Excavator with a broken hammer (for to break road);
3. Level ruler(equipment leveling);
4. Electric concrete vibrator;
5. C30 concrete;
6. Wire trunking, impact drill, drill (
Φ
6),
Φ
8 expansion screw (for to
fix indoor circuit and control box);
7.
Φ
50PVC pipe, T-pipe, straight PVC tube, elbow;
8.
Φ
32PVC pipe, T-pipe, straight PVC tube, elbow;
9.
8 * 0.75 cable(8 cores ,
Φ
0.75mm line);
3 * 2.5 cable(3 cores
Φ
2.5mm line);
2 * 1.5 cable(2 cores ,
Φ
1.5mm line);
All cable upon are RVV line.
10. Wire stripper;
11. Screwdriver and wrench;
12. Set of hex wrenches;
Installation Steps
1. Well prepared,clear the order and location of the various parts of the
installation, excavate foundation .
Note:
Depth of foundation=Tyre killer height(H)+Concrete thickness(300mm)
Length=Tyre killer length(L1)+Watering concrete(400mm)
Width=Tyre killer width(W1)+Watering concrete(400mm)
And one spare pit with for tyre killer hydraulic station, hydraulic station
pit depth is hydraulic station height(H1)+Concrete thickness(300mm),
set drainage for hydraulic station, method same to tyre killer as
following showed.
Above are recommend dimensions. Could make adjustments according
specific construction site.
Содержание 2Z-ATK-6M
Страница 1: ...Automatic Tyre Kille 2Z ATK 6M r Manual ...