109
ZX-E
Operation Manual
S
e
c
tion 5
Line
a
r Outp
ut
Section 5
DETAILED SETTINGS
Setting the Second Point (B)
11.
Use the same procedure as the first point to
set the correction value for the second point.
12.
Press the ENT Key.
Confirming Setting Results
If linear output correction has been registered correctly,
the sub-display will show OK.
If the correction is not registered correctly, the display will
show NG.
Check that the current (or voltage) value for the two
points are not the same and execute again.
Z166-E1-02A.book Page 109 Friday, June 3, 2005 4:18 PM
Содержание ZX-E -
Страница 4: ...2 Preface ZX E Operation Manual Preface ...
Страница 8: ...6 Preface Contents ZX E Operation Manual Preface ...
Страница 11: ...9 ZX E Operation Manual Preface PREFACE ...
Страница 12: ...10 Preface ZX E Operation Manual PREFACE ...
Страница 17: ...Section 1 FEATURES 15 ZX E Operation Manual Section 1 FEATURES ZX E Features 16 ...
Страница 24: ...22 Section 1 ZX E Features ZX E Operation Manual Section 1 FEATURES ...
Страница 44: ...42 Section 2 Confirming Warm up Completion ZX E Operation Manual Section 2 PREPARATIONS FOR MEASUREMENT ...
Страница 62: ...60 Section 3 Adjusting Linearity ZX E Operation Manual Section 3 BASIC OPERATION ...
Страница 80: ...78 Section 4 Measuring Thickness ZX E Operation Manual Section 4 MAIN APPLICATIONS AND SETTING METHODS ...
Страница 156: ...154 Appendices Characteristic Data ZX E Operation Manual APPENDICES ZX EV04T Display value mm Measurement distance mm ...
Страница 158: ...156 Appendices Characteristic Data ZX E Operation Manual APPENDICES ZX EV04T Display value mm Measurement distance mm ...
Страница 162: ...160 Appendices Quick Reference for Displays ZX E Operation Manual APPENDICES ...
Страница 166: ...Index Index 164 ZX E Operation Manual ...
Страница 168: ...166 Revisions ZX E Operation Manual ...