5-1
Section
Test Run
50
5-1
Test Run
Checklist
No.
Item
Criteria
1
Connection of power and I/O lines
Is the wiring correct? Are all terminals tightly secured?
2
Setting of DIP switches
Are communication specifications correctly set?
3
Connection of R/W Head
Is R/W Head correctly connected?
4
Location of data carrier
Are data carrier and R/W Head correctly located?
5
Connection of host computer
Is the RS-232C connector correctly connected?
6
Trigger condition
Is the input condition of trigger correctly set?
Procedure of Test Run
Off-line test in test
mode
– Check of communications between DC and ID Controller
without a host controller connection.
On-line test by host
computer
– Check of communications between host controller and ID
Controller by using test command.
Test run of system
– Check of overall system using actual commands and input/
output status.
Power application
– Check of supply voltage and power terminal connections.
– Check of supply voltage to input/output terminals.
– Check of ID Controller POWER indicators and R/W Head.
Checking of
external input
terminal functions
– Check of STOP operation by RESET input.
– Check of status of trigger input in I/O display mode.
End
Off-line Test in Test Mode
By setting the Test Mode, communication between the ID Controller and DC can
be tested without the Controller being connected to the host computer.
Use this test to check mounting positions before the test run.